(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Pipe Fitting, Male and Female Elbow

Pipe Fitting, Male and Female Elbow

[Features]
· Pipe fitting manufactured from cold rolled steel plate (SPCC) are also available. A standard ‘Screwed Type Malleable Cast Iron Pipe Fitting’ as specified by JIS B 2301. We also manufacture some non-JIS standard products.
· The main material is Mareburu® (blackheart malleable cast iron). The threaded section has a tapered pipe thread. Hot-dip galvanized surface treatment is applied where the surface is processed.
· Hot-dip galvanization has been changed to a superior plating that reduces the environmental burden (RoSH compliant).
· Environmentally friendly: Lead and cadmium are significantly reduced.
· We use high-purity zinc metal that largely reduces the inclusion content of lead (Pb) and cadmium (Cd).
· Superior manufacturing method: No addition of new heavy metals is required.
· Mass production technology has been established by developing a unique production facility and preprocessing method. Heavy metals including bismuth (Bi) are used to replace of lead.
· Excellent performance: The appearance and performance is equivalent to conventional plated parts.
· Conforms to the specifications that are specified in JIS B 2301 (Screwed Type Malleable Cast Iron Pipe Fittings). The fitting has an exterior glossy plated finish—similar to the conventional products.

(i)Caution

  • Some of the items are scheduled to be discontinued as of end of March in 2023. The manufacturer keep the items produced but they are not available with Misumi.
    There are not the replacement items and the plan to resumption of sale. Please check the quotation and order screen for details.

PDF

Part Number

Configured Part Number is shown.

 
Part Number
RSL-15X10A-B
RSL-15X10A-W
RSL-20X15A-W
RSL-25X20A-W
RSL-32X25A-W
RSL-40X32A-B
RSL-40X32A-W
RSL-50X40A-W
SL-6A-B
SL-6A-W
SL-8A-B
SL-8A-W
SL-10A-B
SL-10A-W
SL-15A-B
SL-15A-W
SL-20A-B
SL-20A-W
SL-25A-B
SL-25A-W
SL-32A-W
SL-40A-W
SL-50A-W
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipConnection Type Nominal of Thread M1 Nominal of Thread M2 Surface Treatment

SGD 4.29

280 Piece(s) 8 Day(s) or more Screw⇔Screw Different Diameter1/2B(15A)3/8B(10A)[Not Provided] No

SGD 4.46

1 Piece(s) 3 Day(s) or more Screw⇔Screw Different Diameter1/2B(15A)3/8B(10A)[Zinc Plating] Hot zinc plating

SGD 5.43

1 Piece(s) 7 Day(s) or more Screw⇔Screw Different Diameter3/4B(20A)1/2B(15A)[Zinc Plating] Hot zinc plating

SGD 7.64

1 Piece(s) 5 Day(s) or more Screw⇔Screw Different Diameter1B(25A)3/4B(20A)[Zinc Plating] Hot zinc plating

SGD 10.31

1 Piece(s) 5 Day(s) or more Screw⇔Screw Different Diameter1 1/4B(32A)1B(25A)[Zinc Plating] Hot zinc plating

SGD 12.55

40 Piece(s) 8 Day(s) or more Screw⇔Screw Different Diameter1 1/2B(40A)1 1/4B(32A)[Not Provided] No

SGD 12.55

1 Piece(s) 5 Day(s) or more Screw⇔Screw Different Diameter1 1/2B(40A)1 1/4B(32A)[Zinc Plating] Hot zinc plating

SGD 19.91

1 Piece(s) 5 Day(s) or more Screw⇔Screw Different Diameter2B(50A)1 1/2B(40A)[Zinc Plating] Hot zinc plating

SGD 3.93

1 Piece(s) 5 Day(s) or more Screw⇔Screw Same Diameter・Different Type1/8B(6A)1/8B(6A)[Not Provided] No

SGD 3.94

1 Piece(s) 3 Day(s) or more Screw⇔Screw Same Diameter・Different Type1/8B(6A)1/8B(6A)[Zinc Plating] Hot zinc plating

SGD 3.79

210 Piece(s) 5 Day(s) or more Screw⇔Screw Same Diameter・Different Type1/4B(8A)1/4B(8A)[Not Provided] No

SGD 3.94

1 Piece(s) 3 Day(s) or more Screw⇔Screw Same Diameter・Different Type1/4B(8A)1/4B(8A)[Zinc Plating] Hot zinc plating

SGD 3.79

140 Piece(s) 5 Day(s) or more Screw⇔Screw Same Diameter・Different Type3/8B(10A)3/8B(10A)[Not Provided] No

SGD 3.94

1 Piece(s) 3 Day(s) or more Screw⇔Screw Same Diameter・Different Type3/8B(10A)3/8B(10A)[Zinc Plating] Hot zinc plating

SGD 3.50

140 Piece(s) 6 Day(s) or more Screw⇔Screw Same Diameter・Different Type1/2B(15A)1/2B(15A)[Not Provided] No

SGD 3.52

1 Piece(s) 3 Day(s) or more Screw⇔Screw Same Diameter・Different Type1/2B(15A)1/2B(15A)[Zinc Plating] Hot zinc plating

SGD 3.71

1 Piece(s) 5 Day(s) or more Screw⇔Screw Same Diameter・Different Type3/4B(20A)3/4B(20A)[Not Provided] No

SGD 3.75

1 Piece(s) 3 Day(s) or more Screw⇔Screw Same Diameter・Different Type3/4B(20A)3/4B(20A)[Zinc Plating] Hot zinc plating

SGD 5.62

1 Piece(s) 5 Day(s) or more Screw⇔Screw Same Diameter・Different Type1B(25A)1B(25A)[Not Provided] No

SGD 5.57

1 Piece(s) 3 Day(s) or more Screw⇔Screw Same Diameter・Different Type1B(25A)1B(25A)[Zinc Plating] Hot zinc plating

SGD 8.15

1 Piece(s) 4 Day(s) or more Screw⇔Screw Same Diameter・Different Type1 1/4B(32A)1 1/4B(32A)[Zinc Plating] Hot zinc plating

SGD 10.58

1 Piece(s) 4 Day(s) or more Screw⇔Screw Same Diameter・Different Type1 1/2B(40A)1 1/2B(40A)[Zinc Plating] Hot zinc plating

SGD 15.95

1 Piece(s) 3 Day(s) or more Screw⇔Screw Same Diameter・Different Type2B(50A)2B(50A)[Zinc Plating] Hot zinc plating

Loading...

  1. 1

Basic Information

Connecting Shape Female Male Elbows Material FCMB27-05 Connection Thread Type M1 Rc
Connection Thread Type M2 R Applicable Fluid Water / Air / Steam / Gas / Oil Type Fitting
Max. Operating Pressure(MPa) 2.5 Divisions of Max. Operating Pressure than 2.0Mpa Interior Resin Lining No
Band Presence

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(65) 6733 7211 / FAX:(65) 6733 0211
9:00am - 6:00pm (Monday - Friday)