(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Vertical Pipe Fitting Assembly-Type Standing Band (Electrogalvanized/Stainless Steel/Hot Dip) (A10324-0144)

Vertical Pipe Fitting Assembly-Type Standing Band (Electrogalvanized/Stainless Steel/Hot Dip) A10324-0144

Assembly-type Standing Band for SGP Pipe and Stainless Steel (Thick) Pipe

PDF

Japanese Only

Part Number

Configured Part Number is shown.

A10324-0144

 
Part Number
A10324-0144
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipMain fit tube(or application tube)outside diameter
(mm)
Material Compatible Pipe Type Surface Treatment The size of diameter of steel pipe (A) Nominal Diameter (B) Compatible Pipe Outer Diameter
(mm)

SGD 14.83

1 Piece(s) 10 Day(s) or more 100~Less than 200[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating150A6165.2

Loading...

  1. 1

Basic Information

Type Vertical band Qty.(piece) 1

Please check the type/dimensions/specifications of the part A10324-0144 in the Vertical Pipe Fitting Assembly-Type Standing Band (Electrogalvanized/Stainless Steel/Hot Dip) series.

Similar Part Numbers

Part Number
A10324-0055
A10324-0060
A10324-0074
A10324-0159
A10324-0163
A10324-0178
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipMain fit tube(or application tube)outside diameter
(mm)
Material Compatible Pipe Type Surface Treatment The size of diameter of steel pipe (A) Nominal Diameter (B) Compatible Pipe Outer Diameter
(mm)

SGD 1.03

1 Piece(s) 10 Day(s) or more 40~Less than 50[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating32A1 1/442.7

SGD 1.14

1 Piece(s) 4 Day(s) or more 40~Less than 50[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating40A1 1/248.6

SGD 1.23

1 Piece(s) 4 Day(s) or more 60~Less than 70[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating50A260.5

SGD 15.02

1 Piece(s) 11 Day(s) or more 200~Less than 300[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating200A8216.3

SGD 20.55

1 Piece(s) 11 Day(s) or more 200~Less than 300[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating250A10267.4

SGD 68.69

1 Piece(s) 11 Day(s) or more 300~Less than 400[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating300A12318.5

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(65) 6733 7211 / FAX:(65) 6733 0211
9:00am - 6:00pm (Monday - Friday)