(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Vertical Pipe Fitting Standing Band (Electrogalvanized/Stainless Steel/Hot Dip) (A10323-0113)

Vertical Pipe Fitting Standing Band (Electrogalvanized/Stainless Steel/Hot Dip) A10323-0113

Hinge-type Standing Band for SGP Pipe and Stainless Steel (Thick) Pipe

PDF

Japanese Only

Part Number

Configured Part Number is shown.

A10323-0113

 
Part Number
A10323-0113
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipMain fit tube(or application tube)outside diameter
(mm)
Material Compatible Pipe Type Surface Treatment The size of diameter of steel pipe (A) Nominal Diameter (B) Compatible Pipe Outer Diameter
(mm)

SGD 2.16

1 Piece(s) 4 Day(s) or more 100~Less than 200[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating100A4114.3

Loading...

  1. 1

Basic Information

Type Vertical band Qty.(piece) 1

Please check the type/dimensions/specifications of the part A10323-0113 in the Vertical Pipe Fitting Standing Band (Electrogalvanized/Stainless Steel/Hot Dip) series.

Similar Part Numbers

Part Number
A10323-0043
A10323-0058
A10323-0062
A10323-0128
A10323-0132
A10323-0147
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipMain fit tube(or application tube)outside diameter
(mm)
Material Compatible Pipe Type Surface Treatment The size of diameter of steel pipe (A) Nominal Diameter (B) Compatible Pipe Outer Diameter
(mm)

SGD 1.00

1 Piece(s) 4 Day(s) or more 30~Less than 40[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating25A134

SGD 1.09

1 Piece(s) 4 Day(s) or more 40~Less than 50[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating32A1 1/442.7

SGD 1.14

1 Piece(s) 4 Day(s) or more 40~Less than 50[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating40A1 1/248.6

SGD 7.74

1 Piece(s) 4 Day(s) or more 100~Less than 200[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating125A5139.8

SGD 4.95

1 Piece(s) 6 Day(s) or more 100~Less than 200[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating150A6165.2

SGD 9.62

1 Piece(s) 7 Day(s) or more 100~Less than 200[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating175A7190.7

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(65) 6733 7211 / FAX:(65) 6733 0211
9:00am - 6:00pm (Monday - Friday)