(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Steel Pipe Fitting, Screw-In Pipe Fitting, Street Elbow

Steel Pipe Fitting, Screw-In Pipe Fitting, Street Elbow

Maximum operating pressure: 2.5 MPa (steady flow of water at no more than 120°C), 1.0 MPa (steam, air, gas, and oil at no more than 300°C).

PDF

Japanese Only

Part Number

Configured Part Number is shown.

Part Number
SL-1/2B-B
SL-1/2B-C
SL-1/2B-W
SL-1/4B-B
SL-1/4B-W
SL-1/8B-B
SL-1/8B-W
SL-1B-B
SL-1B-C
SL-1B-W
SL-2B-B
SL-2B-C
SL-2B-W
SL-3/4B-B
SL-3/4B-C
SL-3/4B-W
SL-3/8B-B
SL-3/8B-W
SL-3B-B
SL-3B-W
SL-4B-B
SL-4B-W
SL-11/2B-B
SL-11/2B-C
SL-11/2B-W
SL-11/4B-B
SL-11/4B-C
SL-11/4B-W
SL-21/2B-B
SL-21/2B-W
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipNominal of Thread M1 Nominal of Thread M2 Applicable Fluid Surface Treatment

SGD 3.05

1 Piece(s) 6 Day(s) or more 1/2B(15A)1/2B(15A)Water / Air / Steam / OilNo

SGD 9.90

1 Piece(s) 6 Day(s) or more 1/2B(15A)1/2B(15A)Water[Resin Coating] Epoxy Resin Coating

SGD 3.34

1 Piece(s) 6 Day(s) or more 1/2B(15A)1/2B(15A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating

SGD 3.53

1 Piece(s) 6 Day(s) or more 1/4B(8A)1/4B(8A)Water / Air / Steam / OilNo

SGD 3.75

1 Piece(s) 4 Day(s) or more 1/4B(8A)1/4B(8A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating

SGD 3.53

1 Piece(s) 6 Day(s) or more 1/8B(6A)1/8B(6A)Water / Air / Steam / OilNo

SGD 3.75

1 Piece(s) 6 Day(s) or more 1/8B(6A)1/8B(6A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating

SGD 5.39

1 Piece(s) 6 Day(s) or more 1B(25A)1B(25A)Water / Air / Steam / OilNo

SGD 14.35

1 Piece(s) 6 Day(s) or more 1B(25A)1B(25A)Water[Resin Coating] Epoxy Resin Coating

SGD 5.80

1 Piece(s) 5 Day(s) or more 1B(25A)1B(25A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating

SGD 15.05

1 Piece(s) 6 Day(s) or more 2B(50A)2B(50A)Water / Air / Steam / OilNo

SGD 34.43

1 Piece(s) 10 Day(s) or more 2B(50A)2B(50A)Water[Resin Coating] Epoxy Resin Coating

SGD 15.13

1 Piece(s) 6 Day(s) or more 2B(50A)2B(50A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating

SGD 3.32

1 Piece(s) 6 Day(s) or more 3/4B(20A)3/4B(20A)Water / Air / Steam / OilNo

SGD 10.50

1 Piece(s) 6 Day(s) or more 3/4B(20A)3/4B(20A)Water[Resin Coating] Epoxy Resin Coating

SGD 3.60

1 Piece(s) 5 Day(s) or more 3/4B(20A)3/4B(20A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating

SGD 3.53

1 Piece(s) 6 Day(s) or more 3/8B(10A)3/8B(10A)Water / Air / Steam / OilNo

SGD 3.75

1 Piece(s) 6 Day(s) or more 3/8B(10A)3/8B(10A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating

SGD 51.03

1 Piece(s) 10 Day(s) or more 3B(80A)3B(80A)Water / Air / Steam / OilNo

SGD 58.44

1 Piece(s) 6 Day(s) or more 3B(80A)3B(80A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating

SGD 95.88

1 Piece(s) 10 Day(s) or more 4B(100A)4B(100A)Water / Air / Steam / OilNo

SGD 83.35

1 Piece(s) 6 Day(s) or more 4B(100A)4B(100A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating

SGD 10.32

1 Piece(s) 6 Day(s) or more 1 1/2B(40A)1 1/2B(40A)Water / Air / Steam / OilNo

SGD 25.70

1 Piece(s) 10 Day(s) or more 1 1/2B(40A)1 1/2B(40A)Water[Resin Coating] Epoxy Resin Coating

SGD 11.98

1 Piece(s) 5 Day(s) or more 1 1/2B(40A)1 1/2B(40A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating

SGD 7.79

1 Piece(s) 6 Day(s) or more 1 1/4B(32A)1 1/4B(32A)Water / Air / Steam / OilNo

SGD 20.69

1 Piece(s) 10 Day(s) or more 1 1/4B(32A)1 1/4B(32A)Water[Resin Coating] Epoxy Resin Coating

SGD 9.05

1 Piece(s) 6 Day(s) or more 1 1/4B(32A)1 1/4B(32A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating

SGD 32.49

1 Piece(s) 10 Day(s) or more 2 1/2B(65A)2 1/2B(65A)Water / Air / Steam / OilNo

SGD 37.93

1 Piece(s) 6 Day(s) or more 2 1/2B(65A)2 1/2B(65A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating

Loading...

  1. 1

Basic Information

Connecting Shape Street Elbow Connection Type Screw⇔Screw Same Diameter・Different Type Material Black heart malleable cast iron (FCMB27-05)
Connection Thread Type M1 Rc Connection Thread Type M2 R Type Fitting
Max. Operating Pressure(MPa) 2.5 Divisions of Max. Operating Pressure than 2.0Mpa Interior Resin Lining No
Band Presence

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(65) 6733 7211 / FAX:(65) 6733 0211
9:00am - 6:00pm (Monday - Friday)