(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Steel Pipe Fitting, Screw-in Pipe Fitting, Tee

Steel Pipe Fitting, Screw-in Pipe Fitting, Tee

Maximum operating pressure: 2.5 MPa (steady flow of water at no more than 120°C or below), 1.0 MPa (steam, air, gas, and oil at no more than 300°C).

PDF

Japanese Only

Part Number

Configured Part Number is shown.

Part Number
BT-1/2B-W
BT-1B-W
BT-2B-W
BT-3/4B-W
BT-3B-B
BT-3B-W
BT-4B-B
BT-4B-W
BT-5B-B
BT-5B-W
BT-6B-B
BT-6B-W
BT-11/2B-W
BT-11/4B-W
BT-21/2B-B
BT-21/2B-W
T-1/2B-B
T-1/2B-W
T-1/4B-B
T-1/4B-W
T-1/8B-B
T-1/8B-W
T-1B-B
T-1B-W
T-2B-B
T-2B-W
T-3/4B-B
T-3/4B-W
T-3/8B-B
T-3/8B-W
T-11/2B-B
T-11/2B-W
T-11/4B-B
T-11/4B-W
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipNominal of Thread M1 Applicable Fluid Surface Treatment Band

SGD 2.23

1 Piece(s) 6 Day(s) or more 1/2B(15A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingPresence

SGD 3.83

1 Piece(s) 6 Day(s) or more 1B(25A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingPresence

SGD 11.60

1 Piece(s) 6 Day(s) or more 2B(50A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingPresence

SGD 2.73

1 Piece(s) 4 Day(s) or more 3/4B(20A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingPresence

SGD 42.70

1 Piece(s) 10 Day(s) or more 3B(80A)Water / Air / Steam / OilNoPresence

SGD 49.64

1 Piece(s) 10 Day(s) or more 3B(80A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingPresence

SGD 71.98

1 Piece(s) 10 Day(s) or more 4B(100A)Water / Air / Steam / OilNoPresence

SGD 83.32

1 Piece(s) 10 Day(s) or more 4B(100A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingPresence

SGD 189.36

1 Piece(s) 10 Day(s) or more 5B(125A)Water / Air / Steam / OilNoPresence

SGD 157.82

1 Piece(s) 10 Day(s) or more 5B(125A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingPresence

SGD 287.22

1 Piece(s) 10 Day(s) or more 6B(150A)Water / Air / Steam / OilNoPresence

SGD 239.35

1 Piece(s) 10 Day(s) or more 6B(150A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingPresence

SGD 7.42

1 Piece(s) 6 Day(s) or more 1 1/2B(40A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingPresence

SGD 5.99

1 Piece(s) 6 Day(s) or more 1 1/4B(32A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingPresence

SGD 29.34

1 Piece(s) 10 Day(s) or more 2 1/2B(65A)Water / Air / Steam / OilNoPresence

SGD 35.00

1 Piece(s) 10 Day(s) or more 2 1/2B(65A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingPresence

SGD 2.56

1 Piece(s) 4 Day(s) or more 1/2B(15A)Water / Air / Steam / OilNoNo

SGD 2.46

1 Piece(s) 4 Day(s) or more 1/2B(15A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingNo

SGD 3.53

1 Piece(s) 6 Day(s) or more 1/4B(8A)Water / Air / Steam / OilNoNo

SGD 3.75

1 Piece(s) 4 Day(s) or more 1/4B(8A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingNo

SGD 3.53

1 Piece(s) 10 Day(s) or more 1/8B(6A)Water / Air / Steam / OilNoNo

SGD 3.75

1 Piece(s) 10 Day(s) or more 1/8B(6A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingNo

SGD 4.43

1 Piece(s) 6 Day(s) or more 1B(25A)Water / Air / Steam / OilNoNo

SGD 4.80

1 Piece(s) 4 Day(s) or more 1B(25A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingNo

SGD 13.32

1 Piece(s) 6 Day(s) or more 2B(50A)Water / Air / Steam / OilNoNo

SGD 15.92

1 Piece(s) 4 Day(s) or more 2B(50A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingNo

SGD 3.13

1 Piece(s) 4 Day(s) or more 3/4B(20A)Water / Air / Steam / OilNoNo

SGD 2.54

1 Piece(s) 5 Day(s) or more 3/4B(20A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingNo

SGD 3.53

1 Piece(s) 6 Day(s) or more 3/8B(10A)Water / Air / Steam / OilNoNo

SGD 3.13

1 Piece(s) 4 Day(s) or more 3/8B(10A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingNo

SGD 8.58

1 Piece(s) 4 Day(s) or more 1 1/2B(40A)Water / Air / Steam / OilNoNo

SGD 9.93

1 Piece(s) 4 Day(s) or more 1 1/2B(40A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingNo

SGD 6.90

1 Piece(s) 5 Day(s) or more 1 1/4B(32A)Water / Air / Steam / OilNoNo

SGD 7.99

1 Piece(s) 5 Day(s) or more 1 1/4B(32A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingNo

Loading...

  1. 1

Basic Information

Connecting Shape Tee Connection Type Screw⇔Screw Same Diameter・Different Type Material STPG370(SCH40)
Connection Thread Type M1 Rc Type Fitting Max. Operating Pressure(MPa) 2.5
Divisions of Max. Operating Pressure than 2.0Mpa Interior Resin Lining No

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(65) 6733 7211 / FAX:(65) 6733 0211
9:00am - 6:00pm (Monday - Friday)