(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.
A wide variety of standard and configurable components for factory automation engineers in industries such as automotive, semiconductor, packaging, medical and many more.
A good selection of accessories such as screws, bolts, washers and nuts that you may need for your daily engineering usage.
Browse industrial materials ranging from heat insulating plates, sponges, to metal and plastic materials in different sizes to meet your various applications.
A wide variety of wiring parts for connecting and protecting control and PC parts including Connectors, Cables, Electric Wires, Crimping Terminals and more.
A wide variety of controls and PC parts for electrical engineers including Controls, Powers, PC parts and more.
A wide variety of cutting tools for many uses and work materials including End Mills, Drills, Cutters, Reamers, Turning Tools and more.
A wide variety of tools and supplies used in processing including Machine Tools, Measurement Tools, Grinding and Polishing Supplies and more.
A wide variety of goods used in shipment, material handling and warehouse including Tape supplies, Stretch film, Truck, Shelf, Crane and more.
A large variety of goods for every kind of factories and offices including Protection items, Cleaning supplies, sanitations, office supplies and more.
A large variety of items used in R&D and Clean Room including research Equipment, Laboratory Essentials, Analysis Supplies, Clean Environment-Related Equipment and more.
Choose from thousands of standard stamping die components including Punch & Die, Gas Springs, Guide Components, Coil Springs and many more.
Browse our wide variety of mold components including Ejector Pins, Sleeves, Leader Components, Sprue Bushings and many more.
Browse our injection molding components including Heating Items, Couplers, Hoses and more.
Individual motor product from the world K series usable in Japan and throughout the world.
[Features]
· Conforms to international safety standards.
· All models are compliant with international safety standards and have overheating protection equipment built in.
· UL/CSA standards certified.
Chinese compulsory product authorization system (CCC system) certified.
CE marking (low voltage directive) compliant.
· Motor overheat protection device built in.
Thermal protection, impedance protection.
· Supports Japan domestic and major foreign country power supply voltages.
· Can be quickly obtained even overseas when required.
· Can be combined with orthogonal shaft gearhead to achieve device space saving
Japanese Only
Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Days to Ship | Square Flange Dim. A (mm) | Rated Output (W) | Environment | Voltage (V) | Shaft end shape | Connection type |
---|---|---|---|---|---|---|---|---|---|---|
SGD 139.00 SGD 97.30 | 1 Piece(s) | 12 Day(s) | 42 | 1 | Standard | 100 | Round shaft type | Lead Wire | ||
SGD 139.00 SGD 97.30 | 1 Piece(s) | 12 Day(s) | 42 | 1 | Standard | 110 ~ 115 | Round shaft type | Lead Wire | ||
SGD 143.00 SGD 100.10 | 1 Piece(s) | 12 Day(s) | 42 | 1 | Standard | 200 | Round shaft type | Lead Wire | ||
SGD 139.00 SGD 97.30 | 1 Piece(s) | 12 Day(s) | 42 | 1 | Standard | 100 | Pinion shaft type | Lead Wire | ||
SGD 139.00 SGD 97.30 | 1 Piece(s) | 12 Day(s) | 42 | 1 | Standard | 110 ~ 115 | Pinion shaft type | Lead Wire | ||
SGD 143.00 SGD 100.10 | 1 Piece(s) | 12 Day(s) | 42 | 1 | Standard | 200 | Pinion shaft type | Lead Wire | ||
SGD 210.00 SGD 147.00 | 1 Piece(s) | 12 Day(s) | 60 | 6 | Standard / Water Proofing / Dust Proofing | 100 | Round shaft type | IP65 terminal box included | ||
SGD 210.00 SGD 147.00 | 1 Piece(s) | 12 Day(s) | 60 | 6 | Standard / Water Proofing / Dust Proofing | 110 ~ 115 | Round shaft type | IP65 terminal box included | ||
SGD 126.00 SGD 88.20 | 1 Piece(s) | 9 Day(s) | 60 | 6 | Standard | 100 | Round shaft type | Lead Wire | ||
SGD 126.00 SGD 88.20 | 1 Piece(s) | 9 Day(s) | 60 | 6 | Standard | 110 ~ 115 | Round shaft type | Lead Wire | ||
SGD 215.00 SGD 150.50 | 1 Piece(s) | 12 Day(s) | 60 | 6 | Standard / Water Proofing / Dust Proofing | 220 ~ 230 | Round shaft type | IP65 terminal box included | ||
SGD 215.00 SGD 150.50 | 1 Piece(s) | 12 Day(s) | 60 | 6 | Standard / Water Proofing / Dust Proofing | 200 | Round shaft type | IP65 terminal box included | ||
SGD 129.00 SGD 90.30 | 1 Piece(s) | 9 Day(s) | 60 | 6 | Standard | 220 ~ 230 | Round shaft type | Lead Wire | ||
SGD 129.00 SGD 90.30 | 1 Piece(s) | 9 Day(s) | 60 | 6 | Standard | 200 | Round shaft type | Lead Wire | ||
SGD 210.00 SGD 147.00 | 1 Piece(s) | 12 Day(s) | 60 | 6 | Standard / Water Proofing / Dust Proofing | 100 | Pinion shaft type | IP65 terminal box included | ||
SGD 210.00 SGD 147.00 | 1 Piece(s) | 12 Day(s) | 60 | 6 | Standard / Water Proofing / Dust Proofing | 110 ~ 115 | Pinion shaft type | IP65 terminal box included | ||
SGD 126.00 SGD 88.20 | 1 Piece(s) | 9 Day(s) | 60 | 6 | Standard | 100 | Pinion shaft type | Lead Wire | ||
SGD 126.00 SGD 88.20 | 1 Piece(s) | 9 Day(s) | 60 | 6 | Standard | 110 ~ 115 | Pinion shaft type | Lead Wire | ||
SGD 215.00 SGD 150.50 | 1 Piece(s) | 12 Day(s) | 60 | 6 | Standard / Water Proofing / Dust Proofing | 220 ~ 230 | Pinion shaft type | IP65 terminal box included | ||
SGD 215.00 SGD 150.50 | 1 Piece(s) | 12 Day(s) | 60 | 6 | Standard / Water Proofing / Dust Proofing | 200 | Pinion shaft type | IP65 terminal box included | ||
SGD 129.00 SGD 90.30 | 1 Piece(s) | 9 Day(s) | 60 | 6 | Standard | 220 ~ 230 | Pinion shaft type | Lead Wire | ||
SGD 129.00 SGD 90.30 | 1 Piece(s) | 9 Day(s) | 60 | 6 | Standard | 200 | Pinion shaft type | Lead Wire | ||
SGD 140.00 SGD 98.00 | 1 Piece(s) | 9 Day(s) | 70 | 15 | Standard | 100 | Round shaft type | Lead Wire | ||
SGD 140.00 SGD 98.00 | 1 Piece(s) | 9 Day(s) | 70 | 15 | Standard | 110 ~ 115 | Round shaft type | Lead Wire | ||
SGD 143.00 SGD 100.10 | 1 Piece(s) | 9 Day(s) | 70 | 15 | Standard | 220 ~ 230 | Round shaft type | Lead Wire | ||
SGD 143.00 SGD 100.10 | 1 Piece(s) | 9 Day(s) | 70 | 15 | Standard | 200 | Round shaft type | Lead Wire | ||
SGD 140.00 SGD 98.00 | 1 Piece(s) | 9 Day(s) | 70 | 15 | Standard | 100 | Pinion shaft type | Lead Wire | ||
SGD 140.00 SGD 98.00 | 1 Piece(s) | 9 Day(s) | 70 | 15 | Standard | 110 ~ 115 | Pinion shaft type | Lead Wire | ||
SGD 143.00 SGD 100.10 | 1 Piece(s) | 9 Day(s) | 70 | 15 | Standard | 220 ~ 230 | Pinion shaft type | Lead Wire | ||
SGD 143.00 SGD 100.10 | 1 Piece(s) | 9 Day(s) | 70 | 15 | Standard | 200 | Pinion shaft type | Lead Wire | ||
SGD 152.00 SGD 106.40 | 1 Piece(s) | 9 Day(s) | 80 | 25 | Standard | 100 | Round shaft type | Lead Wire | ||
SGD 207.00 SGD 144.90 | 1 Piece(s) | 12 Day(s) | 80 | 25 | Standard | 110 ~ 115 | Round shaft type | With Terminal Box | ||
SGD 207.00 SGD 144.90 | 1 Piece(s) | 12 Day(s) | 80 | 25 | Standard | 110 ~ 115 | Round shaft type | With Terminal Box | ||
SGD 152.00 SGD 106.40 | 1 Piece(s) | 9 Day(s) | 80 | 25 | Standard | 110 ~ 115 | Round shaft type | Lead Wire | ||
SGD 159.00 SGD 111.30 | 1 Piece(s) | 9 Day(s) | 80 | 25 | Standard | 220 ~ 230 | Round shaft type | Lead Wire | ||
SGD 159.00 SGD 111.30 | 1 Piece(s) | 9 Day(s) | 80 | 25 | Standard | 200 | Round shaft type | Lead Wire | ||
SGD 212.00 SGD 148.40 | 1 Piece(s) | 12 Day(s) | 80 | 25 | Standard | 220 ~ 230 | Round shaft type | With Terminal Box | ||
SGD 212.00 SGD 148.40 | 1 Piece(s) | 12 Day(s) | 80 | 25 | Standard | 200 | Round shaft type | With Terminal Box | ||
SGD 152.00 SGD 106.40 | 1 Piece(s) | 9 Day(s) | 80 | 25 | Standard | 100 | Pinion shaft type | Lead Wire | ||
SGD 207.00 SGD 144.90 | 1 Piece(s) | 12 Day(s) | 80 | 25 | Standard | 100 | Pinion shaft type | With Terminal Box | ||
SGD 207.00 SGD 144.90 | 1 Piece(s) | 12 Day(s) | 80 | 25 | Standard | 110 ~ 115 | Pinion shaft type | With Terminal Box | ||
SGD 152.00 SGD 106.40 | 1 Piece(s) | 9 Day(s) | 80 | 25 | Standard | 110 ~ 115 | Pinion shaft type | Lead Wire | ||
SGD 159.00 SGD 111.30 | 1 Piece(s) | 9 Day(s) | 80 | 25 | Standard | 220 ~ 230 | Pinion shaft type | Lead Wire | ||
SGD 159.00 SGD 111.30 | 1 Piece(s) | 9 Day(s) | 80 | 25 | Standard | 200 | Pinion shaft type | Lead Wire | ||
SGD 212.00 SGD 148.40 | 1 Piece(s) | 12 Day(s) | 80 | 25 | Standard | 220 ~ 230 | Pinion shaft type | With Terminal Box | ||
SGD 212.00 SGD 148.40 | 1 Piece(s) | 12 Day(s) | 80 | 25 | Standard | 200 | Pinion shaft type | With Terminal Box | ||
SGD 185.00 SGD 129.50 | 1 Piece(s) | 9 Day(s) | 90 | 40 | Standard | 100 | Round shaft type | Lead Wire | ||
SGD 239.00 SGD 167.30 | 1 Piece(s) | 12 Day(s) | 90 | 40 | Standard | 100 | Round shaft type | With Terminal Box | ||
SGD 239.00 SGD 167.30 | 1 Piece(s) | 12 Day(s) | 90 | 40 | Standard | 110 ~ 115 | Round shaft type | With Terminal Box | ||
SGD 185.00 SGD 129.50 | 1 Piece(s) | 9 Day(s) | 90 | 40 | Standard | 110 ~ 115 | Round shaft type | Lead Wire | ||
SGD 192.00 SGD 134.40 | 1 Piece(s) | 9 Day(s) | 90 | 40 | Standard | 220 ~ 230 | Round shaft type | Lead Wire | ||
SGD 192.00 SGD 134.40 | 1 Piece(s) | 9 Day(s) | 90 | 40 | Standard | 200 | Round shaft type | Lead Wire | ||
SGD 246.00 SGD 172.20 | 1 Piece(s) | 12 Day(s) | 90 | 40 | Standard | 220 ~ 230 | Round shaft type | With Terminal Box | ||
SGD 246.00 SGD 172.20 | 1 Piece(s) | 12 Day(s) | 90 | 40 | Standard | 200 | Round shaft type | With Terminal Box | ||
SGD 185.00 SGD 129.50 | 1 Piece(s) | 9 Day(s) | 90 | 40 | Standard | 100 | Pinion shaft type | Lead Wire | ||
SGD 239.00 SGD 167.30 | 1 Piece(s) | 12 Day(s) | 90 | 40 | Standard | 100 | Pinion shaft type | With Terminal Box | ||
SGD 239.00 SGD 167.30 | 1 Piece(s) | 12 Day(s) | 90 | 40 | Standard | 110 ~ 115 | Pinion shaft type | With Terminal Box | ||
SGD 185.00 SGD 129.50 | 1 Piece(s) | 9 Day(s) | 90 | 40 | Standard | 110 ~ 115 | Pinion shaft type | Lead Wire | ||
SGD 192.00 SGD 134.40 | 1 Piece(s) | 9 Day(s) | 90 | 40 | Standard | 220 ~ 230 | Pinion shaft type | Lead Wire | ||
SGD 192.00 SGD 134.40 | 1 Piece(s) | 9 Day(s) | 90 | 40 | Standard | 200 | Pinion shaft type | Lead Wire | ||
SGD 246.00 SGD 172.20 | 1 Piece(s) | 12 Day(s) | 90 | 40 | Standard | 220 ~ 230 | Pinion shaft type | With Terminal Box | ||
SGD 246.00 SGD 172.20 | 1 Piece(s) | 12 Day(s) | 90 | 40 | Standard | 200 | Pinion shaft type | With Terminal Box | ||
SGD 218.00 SGD 152.60 | 1 Piece(s) | 9 Day(s) | 90 | 60 | Standard | 100 | Round shaft type | Lead Wire | ||
SGD 270.00 SGD 189.00 | 1 Piece(s) | 12 Day(s) | 90 | 60 | Standard | 100 | Round shaft type | With Terminal Box | ||
SGD 270.00 SGD 189.00 | 1 Piece(s) | 12 Day(s) | 90 | 60 | Standard | 110 ~ 115 | Round shaft type | With Terminal Box | ||
SGD 218.00 SGD 152.60 | 1 Piece(s) | 9 Day(s) | 90 | 60 | Standard | 110 ~ 115 | Round shaft type | Lead Wire | ||
SGD 225.00 SGD 157.50 | 1 Piece(s) | 9 Day(s) | 90 | 60 | Standard | 220 ~ 230 | Round shaft type | Lead Wire | ||
SGD 225.00 SGD 157.50 | 1 Piece(s) | 9 Day(s) | 90 | 60 | Standard | 200 | Round shaft type | Lead Wire | ||
SGD 279.00 SGD 195.30 | 1 Piece(s) | 12 Day(s) | 90 | 60 | Standard | 220 ~ 230 | Round shaft type | With Terminal Box | ||
SGD 279.00 SGD 195.30 | 1 Piece(s) | 12 Day(s) | 90 | 60 | Standard | 200 | Round shaft type | With Terminal Box | ||
SGD 218.00 SGD 152.60 | 1 Piece(s) | 9 Day(s) | 90 | 60 | Standard | 100 | Pinion shaft type | Lead Wire | ||
SGD 270.00 SGD 189.00 | 1 Piece(s) | 12 Day(s) | 90 | 60 | Standard | 100 | Pinion shaft type | With Terminal Box | ||
SGD 270.00 SGD 189.00 | 1 Piece(s) | 12 Day(s) | 90 | 60 | Standard | 110 ~ 115 | Pinion shaft type | With Terminal Box | ||
SGD 218.00 SGD 152.60 | 1 Piece(s) | 9 Day(s) | 90 | 60 | Standard | 110 ~ 115 | Pinion shaft type | Lead Wire | ||
SGD 225.00 SGD 157.50 | 1 Piece(s) | 9 Day(s) | 90 | 60 | Standard | 220 ~ 230 | Pinion shaft type | Lead Wire | ||
SGD 225.00 SGD 157.50 | 1 Piece(s) | 9 Day(s) | 90 | 60 | Standard | 200 | Pinion shaft type | Lead Wire | ||
SGD 279.00 SGD 195.30 | 1 Piece(s) | 12 Day(s) | 90 | 60 | Standard | 220 ~ 230 | Pinion shaft type | With Terminal Box | ||
SGD 279.00 SGD 195.30 | 1 Piece(s) | 12 Day(s) | 90 | 60 | Standard | 200 | Pinion shaft type | With Terminal Box | ||
SGD 252.00 SGD 176.40 | 1 Piece(s) | 9 Day(s) | 90 | 90 | Standard | 100 | Round shaft type | Lead Wire | ||
SGD 305.00 SGD 213.50 | 1 Piece(s) | 12 Day(s) | 90 | 90 | Standard | 100 | Round shaft type | With Terminal Box | ||
SGD 305.00 SGD 213.50 | 1 Piece(s) | 12 Day(s) | 90 | 90 | Standard | 110 ~ 115 | Round shaft type | With Terminal Box | ||
SGD 252.00 SGD 176.40 | 1 Piece(s) | 9 Day(s) | 90 | 90 | Standard | 110 ~ 115 | Round shaft type | Lead Wire | ||
SGD 260.00 SGD 182.00 | 1 Piece(s) | 9 Day(s) | 90 | 90 | Standard | 200 | Round shaft type | Lead Wire | ||
SGD 314.00 SGD 219.80 | 1 Piece(s) | 12 Day(s) | 90 | 90 | Standard | 200 | Round shaft type | With Terminal Box | ||
SGD 260.00 SGD 182.00 | 1 Piece(s) | 9 Day(s) | 90 | 90 | Standard | 220 ~ 230 | Round shaft type | Lead Wire | ||
SGD 314.00 SGD 219.80 | 1 Piece(s) | 12 Day(s) | 90 | 90 | Standard | 220 ~ 230 | Round shaft type | With Terminal Box | ||
SGD 252.00 SGD 176.40 | 1 Piece(s) | 9 Day(s) | 90 | 90 | Standard | 100 | Pinion shaft type | Lead Wire | ||
SGD 305.00 SGD 213.50 | 1 Piece(s) | 12 Day(s) | 90 | 90 | Standard | 100 | Pinion shaft type | With Terminal Box | ||
SGD 305.00 SGD 213.50 | 1 Piece(s) | 12 Day(s) | 90 | 90 | Standard | 110 ~ 115 | Pinion shaft type | With Terminal Box | ||
SGD 252.00 SGD 176.40 | 1 Piece(s) | 9 Day(s) | 90 | 90 | Standard | 110 ~ 115 | Pinion shaft type | Lead Wire |
Loading...
Type | Motor Unit | Motor Type | Reversible | Power Supply | Single-phase |
---|---|---|---|---|---|
Electromagnetic Brakes, Clutches | No |
How can we improve?
How can we improve?