(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Flexible Pipe Fitting, ES-10/11 Series

Flexible Pipe Fitting, ES-10/11 Series

Enhanced extension length capability reduces the need for pipe fittings and fixing points, making it economical. Strong resistance to water hammering and shocks, and superior durability.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

Part Number
ES-10-100-20A
ES-10-100-25A
ES-10-100-32A
ES-10-100-40A
ES-10-100-50A
ES-10-100-65A
ES-10-100-80A
ES-10-100-100A
ES-10-200-25A
ES-10-200-32A
ES-10-200-40A
ES-10-200-50A
ES-10-200-65A
ES-10-200-80A
ES-10-200-100A
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipConnecting Part Material Nominal Thread Name B (Name A) Maximum Expansion and Contraction Length
(mm)

SGD 938.04

1 Piece(s) 8 Day(s) or more [Cast Iron] Spherical Graphite Cast Iron3/4B(20A)100

SGD 938.04

1 Piece(s) 8 Day(s) or more [Cast Iron] Spherical Graphite Cast Iron1B(25A)100

SGD 1,072.04

1 Piece(s) 8 Day(s) or more [Cast Iron] Spherical Graphite Cast Iron1 1/4B(32A)100

SGD 1,175.12

1 Piece(s) 8 Day(s) or more [Cast Iron] Spherical Graphite Cast Iron1 1/2(B40A)100

SGD 1,278.20

1 Piece(s) 8 Day(s) or more [Cast Iron] Spherical Graphite Cast Iron2B(50A)100

SGD 1,979.15

1 Piece(s) 8 Day(s) or more [Cast Iron] Spherical Graphite Cast Iron2 1/2B(65A)100

SGD 2,216.21

1 Piece(s) 8 Day(s) or more [Cast Iron] Spherical Graphite Cast Iron3B(80A)100

SGD 3,020.24

1 Piece(s) 8 Day(s) or more [Cast Iron] Spherical Graphite Cast Iron4B(100A)100

SGD 1,082.34

1 Piece(s) 8 Day(s) or more [Steel] Rolled Steel1B(25A)200

SGD 1,309.12

1 Piece(s) 8 Day(s) or more [Steel] Rolled Steel1 1/4B(32A)200

SGD 1,443.12

1 Piece(s) 8 Day(s) or more [Steel] Rolled Steel1 1/2(B40A)200

SGD 2,030.69

1 Piece(s) 8 Day(s) or more [Steel] Rolled Steel2B(50A)200

SGD 2,473.92

1 Piece(s) 8 Day(s) or more [Steel] Rolled Steel2 1/2B(65A)200

SGD 2,762.55

1 Piece(s) 69 Day(s) or more [Steel] Rolled Steel3B(80A)200

SGD 3,700.57

1 Piece(s) 8 Day(s) or more [Steel] Rolled Steel4B(100A)200

Loading...

  1. 1

Basic Information

Fitting Type Sleeved Applicable Fluid Steam / Water / Oil / Air Connecting Part Type Flange
Maximum Operating Pressure(MPa) 1

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(65) 6733 7211 / FAX:(65) 6733 0211
9:00am - 6:00pm (Monday - Friday)