(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Ck Fitting Threaded Transportable Cast Iron Pipe Fittings T

Ck Fitting Threaded Transportable Cast Iron Pipe Fittings T

JIS standard (B2301 screw-in type malleable cast iron pipe fittings) correct fittings.
[Features]
·Conforms to JIS standards.
·The appearance is exactly the same as the conventional product.
· Made in Japan.
[Applications]
·For removing branches from white pipes.

PDF

Part Number

Configured Part Number is shown.

 
Part Number
T-6-B
T-6-W
T-8-B
T-8-W
T-10-B
T-10-W
T-15-B
T-15-C
T-15-W
T-20-B
T-20-C
T-20-W
T-25-B
T-25-C
T-25-W
T-32-B
T-32-C
T-32-W
T-40-B
T-40-C
T-40-W
T-50-B
T-50-C
T-50-W
T-65-B
T-65-C
T-65-W
T-80-B
T-80-C
T-80-W
T-100-B
T-100-C
T-100-W
T-125-B
T-125-C
T-125-W
T-150-B
T-150-C
T-150-W
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipNominal of Thread M1 Applicable Fluid Surface Treatment

SGD 7.41

1 Piece(s) 7 Day(s) or more 1/8B(6A)Water / Air / Steam / Gas / OilNo

SGD 6.89

1 Piece(s) 7 Day(s) or more 1/8B(6A)Water / Air / Gas / OilZinc Plating

SGD 7.41

1 Piece(s) 7 Day(s) or more 1/4B(8A)Water / Air / Steam / Gas / OilNo

SGD 6.89

1 Piece(s) 7 Day(s) or more 1/4B(8A)Water / Air / Gas / OilZinc Plating

SGD 7.41

1 Piece(s) 7 Day(s) or more 3/8B(10A)Water / Air / Steam / Gas / OilNo

SGD 6.89

1 Piece(s) 7 Day(s) or more 3/8B(10A)Water / Air / Gas / OilZinc Plating

SGD 6.10

1 Piece(s) 7 Day(s) or more 1/2B(15A)Water / Air / Steam / Gas / OilNo

SGD 6.97

1 Piece(s) 7 Day(s) or more 1/2B(15A)WaterResin Coating

SGD 5.76

1 Piece(s) 7 Day(s) or more 1/2B(15A)Water / Air / Gas / OilZinc Plating

SGD 6.62

1 Piece(s) 7 Day(s) or more 3/4B(20A)Water / Air / Steam / Gas / OilNo

SGD 7.41

1 Piece(s) 7 Day(s) or more 3/4B(20A)WaterResin Coating

SGD 6.21

1 Piece(s) 7 Day(s) or more 3/4B(20A)Water / Air / Gas / OilZinc Plating

SGD 8.38

1 Piece(s) 7 Day(s) or more 1B(25A)Water / Air / Steam / Gas / OilNo

SGD 9.77

1 Piece(s) 7 Day(s) or more 1B(25A)WaterResin Coating

SGD 7.71

1 Piece(s) 7 Day(s) or more 1B(25A)Water / Air / Gas / OilZinc Plating

SGD 11.68

1 Piece(s) 7 Day(s) or more 1 1/4B(32A)Water / Air / Steam / Gas / OilNo

SGD 13.95

1 Piece(s) 7 Day(s) or more 1 1/4B(32A)WaterResin Coating

SGD 10.54

1 Piece(s) 7 Day(s) or more 1 1/4B(32A)Water / Air / Gas / OilZinc Plating

SGD 13.58

1 Piece(s) 7 Day(s) or more 1 1/2B(40A)Water / Air / Steam / Gas / OilNo

SGD 16.37

1 Piece(s) 7 Day(s) or more 1 1/2B(40A)WaterResin Coating

SGD 12.17

1 Piece(s) 7 Day(s) or more 1 1/2B(40A)Water / Air / Gas / OilZinc Plating

SGD 19.09

1 Piece(s) 7 Day(s) or more 2B(50A)Water / Air / Steam / Gas / OilNo

SGD 24.08

1 Piece(s) 7 Day(s) or more 2B(50A)WaterResin Coating

SGD 16.89

1 Piece(s) 7 Day(s) or more 2B(50A)Water / Air / Gas / OilZinc Plating

SGD 37.92

1 Piece(s) 7 Day(s) or more 2 1/2B(65A)Water / Air / Steam / Gas / OilNo

SGD 53.00

1 Piece(s) 7 Day(s) or more 2 1/2B(65A)WaterResin Coating

SGD 34.29

1 Piece(s) 7 Day(s) or more 2 1/2B(65A)Water / Air / Gas / OilZinc Plating

SGD 55.22

1 Piece(s) 7 Day(s) or more 3B(80A)Water / Air / Steam / Gas / OilNo

SGD 79.11

1 Piece(s) 7 Day(s) or more 3B(80A)WaterResin Coating

SGD 49.96

1 Piece(s) 7 Day(s) or more 3B(80A)Water / Air / Gas / OilZinc Plating

SGD 93.03

1 Piece(s) 7 Day(s) or more 4B(100A)Water / Air / Steam / Gas / OilNo

SGD 125.79

1 Piece(s) 7 Day(s) or more 4B(100A)WaterResin Coating

SGD 84.18

1 Piece(s) 7 Day(s) or more 4B(100A)Water / Air / Gas / OilZinc Plating

SGD 244.74

1 Piece(s) 7 Day(s) or more 5B(125A)Water / Air / Steam / Gas / OilNo

SGD 303.89

1 Piece(s) 7 Day(s) or more 5B(125A)WaterResin Coating

SGD 221.43

1 Piece(s) 7 Day(s) or more 5B(125A)Water / Air / Gas / OilZinc Plating

SGD 371.16

1 Piece(s) 7 Day(s) or more 6B(150A)Water / Air / Steam / Gas / OilNo

SGD 471.26

1 Piece(s) 7 Day(s) or more 6B(150A)WaterResin Coating

SGD 335.83

1 Piece(s) 7 Day(s) or more 6B(150A)Water / Air / Gas / OilZinc Plating

Loading...

  1. 1

Basic Information

Connecting Shape Tee Connection Type Screw⇔Screw Same Diameter・Different Type Material Cast Iron
Connection Thread Type M1 Rc Type Fitting Max. Operating Pressure(MPa) 2.5
Divisions of Max. Operating Pressure than 2.0Mpa Interior Resin Lining No

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(65) 6733 7211 / FAX:(65) 6733 0211
9:00am - 6:00pm (Monday - Friday)