(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Ck Fitting Threaded Transportable Cast Iron Pipe Fittings Plug

Ck Fitting Threaded Transportable Cast Iron Pipe Fittings Plug

JIS standard (B2301 screw-in type malleable cast iron pipe fittings) correct threaded fittings.
[Features]
· Made in Japan.
[Applications]
·Ideal for ends to threaded fittings of white piping.

PDF

Part Number

Configured Part Number is shown.

 
Part Number
P-6-B
P-6-W
P-8-B
P-8-W
P-10-B
P-10-W
P-15-B
P-15-C
P-15-W
P-20-B
P-20-C
P-20-W
P-25-B
P-25-C
P-25-W
P-32-B
P-32-C
P-32-W
P-40-B
P-40-C
P-40-W
P-50-B
P-50-C
P-50-W
P-65-B
P-65-C
P-65-W
P-80-B
P-80-C
P-80-W
P-100-B
P-100-C
P-100-W
P-125-B
P-125-C
P-125-W
P-150-B
P-150-C
P-150-W
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipNominal of Thread M1 Applicable Fluid Surface Treatment

SGD 4.90

1 Piece(s) 7 Day(s) or more 1/8B(6A)Water / Air / Steam / Gas / OilNo

SGD 4.90

1 Piece(s) 7 Day(s) or more 1/8B(6A)Water / Air / Gas / OilZinc Plating

SGD 4.90

1 Piece(s) 7 Day(s) or more 1/4B(8A)Water / Air / Steam / Gas / OilNo

SGD 4.90

1 Piece(s) 7 Day(s) or more 1/4B(8A)Water / Air / Gas / OilZinc Plating

SGD 4.90

1 Piece(s) 7 Day(s) or more 3/8B(10A)Water / Air / Steam / Gas / OilNo

SGD 4.90

1 Piece(s) 7 Day(s) or more 3/8B(10A)Water / Air / Gas / OilZinc Plating

SGD 5.37

1 Piece(s) 7 Day(s) or more 1/2B(15A)Water / Air / Steam / Gas / OilNo

SGD 8.53

1 Piece(s) 7 Day(s) or more 1/2B(15A)WaterResin Coating

SGD 5.13

1 Piece(s) 7 Day(s) or more 1/2B(15A)Water / Air / Gas / OilZinc Plating

SGD 5.81

1 Piece(s) 7 Day(s) or more 3/4B(20A)Water / Air / Steam / Gas / OilNo

SGD 8.74

1 Piece(s) 7 Day(s) or more 3/4B(20A)WaterResin Coating

SGD 5.51

1 Piece(s) 7 Day(s) or more 3/4B(20A)Water / Air / Gas / OilZinc Plating

SGD 6.18

1 Piece(s) 7 Day(s) or more 1B(25A)Water / Air / Steam / Gas / OilNo

SGD 9.26

1 Piece(s) 7 Day(s) or more 1B(25A)WaterResin Coating

SGD 5.83

1 Piece(s) 7 Day(s) or more 1B(25A)Water / Air / Gas / OilZinc Plating

SGD 7.50

1 Piece(s) 7 Day(s) or more 1 1/4B(32A)Water / Air / Steam / Gas / OilNo

SGD 11.53

1 Piece(s) 7 Day(s) or more 1 1/4B(32A)WaterResin Coating

SGD 6.95

1 Piece(s) 7 Day(s) or more 1 1/4B(32A)Water / Air / Gas / OilZinc Plating

SGD 8.38

1 Piece(s) 7 Day(s) or more 1 1/2B(40A)Water / Air / Steam / Gas / OilNo

SGD 13.95

1 Piece(s) 7 Day(s) or more 1 1/2B(40A)WaterResin Coating

SGD 7.71

1 Piece(s) 7 Day(s) or more 1 1/2B(40A)Water / Air / Gas / OilZinc Plating

SGD 10.50

1 Piece(s) 7 Day(s) or more 2B(50A)Water / Air / Steam / Gas / OilNo

SGD 17.19

1 Piece(s) 7 Day(s) or more 2B(50A)WaterResin Coating

SGD 9.53

1 Piece(s) 7 Day(s) or more 2B(50A)Water / Air / Gas / OilZinc Plating

SGD 15.49

1 Piece(s) 7 Day(s) or more 2 1/2B(65A)Water / Air / Steam / Gas / OilNo

SGD 29.18

1 Piece(s) 7 Day(s) or more 2 1/2B(65A)WaterResin Coating

SGD 13.81

1 Piece(s) 7 Day(s) or more 2 1/2B(65A)Water / Air / Gas / OilZinc Plating

SGD 21.88

1 Piece(s) 7 Day(s) or more 3B(80A)Water / Air / Steam / Gas / OilNo

SGD 39.82

1 Piece(s) 7 Day(s) or more 3B(80A)WaterResin Coating

SGD 19.28

1 Piece(s) 7 Day(s) or more 3B(80A)Water / Air / Gas / OilZinc Plating

SGD 37.00

1 Piece(s) 7 Day(s) or more 4B(100A)Water / Air / Steam / Gas / OilNo

SGD 66.28

1 Piece(s) 7 Day(s) or more 4B(100A)WaterResin Coating

SGD 33.47

1 Piece(s) 7 Day(s) or more 4B(100A)Water / Air / Gas / OilZinc Plating

SGD 99.59

1 Piece(s) 7 Day(s) or more 5B(125A)Water / Air / Steam / Gas / OilNo

SGD 147.50

1 Piece(s) 7 Day(s) or more 5B(125A)WaterResin Coating

SGD 90.13

1 Piece(s) 7 Day(s) or more 5B(125A)Water / Air / Gas / OilZinc Plating

SGD 137.01

1 Piece(s) 7 Day(s) or more 6B(150A)Water / Air / Steam / Gas / OilNo

SGD 196.20

1 Piece(s) 7 Day(s) or more 6B(150A)WaterResin Coating

SGD 123.96

1 Piece(s) 7 Day(s) or more 6B(150A)Water / Air / Gas / OilZinc Plating

Loading...

  1. 1

Basic Information

Connecting Shape Plug Connection Type Pitch (Terminal) Material Cast Iron
Connection Thread Type M1 R Type Fitting Max. Operating Pressure(MPa) 2.5
Divisions of Max. Operating Pressure than 2.0Mpa Interior Resin Lining No

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(65) 6733 7211 / FAX:(65) 6733 0211
9:00am - 6:00pm (Monday - Friday)