(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Screw-In Type Malleable Cast Iron Pipe Fitting 45° Elbow (45L-W-3)

Screw-In Type Malleable Cast Iron Pipe Fitting 45° Elbow 45L-W-3

[Features]
• JFE pipe fittings are produced at cutting-edge facilities with thorough quality control.
• Moreover, ring stamp PL fittings are coat-baked with powder epoxy resin on the inner and outer surfaces, excluding screws, using a special coating method, providing enhanced adhesiveness, corrosion resistance, etc.
• Can be used with a high level of reliability.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

45L-W-3

 
Part Number
45L-W-3
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipNominal of Thread M1 Surface Treatment

SGD 48.93

1 Piece(s) 8 Day(s) or more 3B(80A)Zinc Plating

Loading...

  1. 1

Basic Information

Connecting Shape 45° Elbow Connection Type Screw⇔Screw Same Diameter・Different Type Material Cast Iron
Connection Thread Type M1 Rc Applicable Fluid Water / Air / Steam / Gas / Oil Type Fitting
Max. Operating Pressure(MPa) 1 Divisions of Max. Operating Pressure 1.0Mpa or Less Interior Resin Lining No
Details of Max. Operating Pressure (Vapor/Air/Gas/Oil which is 300℃ or Less)(MPa) 1.0 Details of Max. Operating Pressure (Steady Flow which is 120℃ or Less)(MPa) 2.5

Please check the type/dimensions/specifications of the part 45L-W-3 in the Screw-In Type Malleable Cast Iron Pipe Fitting 45° Elbow series.

Similar Part Numbers

Part Number
45L-B-11/2
45L-B-11/4
45L-B-2
45L-W-3/4
45L-W-3/8
45L-W-4
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipNominal of Thread M1 Surface Treatment

SGD 15.23

1 Piece(s) 8 Day(s) or more 1 1/2B(40A)No

SGD 11.48

1 Piece(s) 8 Day(s) or more 1 1/4B(32A)No

SGD 22.64

1 Piece(s) 8 Day(s) or more 2B(50A)No

SGD 3.59

1 Piece(s) 8 Day(s) or more 3/4B(20A)Zinc Plating

SGD 3.72

1 Piece(s) 8 Day(s) or more 3/8B(10A)Zinc Plating

-

1 Piece(s) 14 Day(s) or more 4B(100A)Zinc Plating

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(65) 6733 7211 / FAX:(65) 6733 0211
9:00am - 6:00pm (Monday - Friday)