(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Screw-In Malleable Cast Iron Pipe Fitting, Socket

Screw-In Malleable Cast Iron Pipe Fitting, Socket

[Features]
・ RING Brand fittings are products produced with state-of-the-art equipment and thorough quality control
・ The RING Brand PL fitting has a powder epoxy resin coated on its inner and outer surfaces by a special coating method, excluding the threaded section, and has excellent adhesion, corrosion resistance, etc.
・ Both products are safe to use

PDF

Japanese Only

Part Number

Configured Part Number is shown.

 
Part Number
S-B-1
S-B-1/2
S-B-1/4
S-B-1/8
S-B-2
S-B-3
S-B-3/4
S-B-3/8
S-B-4
S-B-5
S-B-6
S-B-11/2
S-B-11/4
S-B-21/2
S-W-1
S-W-1/2
S-W-1/4
S-W-1/8
S-W-2
S-W-3
S-W-3/4
S-W-3/8
S-W-4
S-W-5
S-W-6
S-W-11/2
S-W-11/4
S-W-21/2
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipNominal of Thread M1 Surface Treatment

SGD 4.44

1 Piece(s) 8 Day(s) or more 1B(25A)No

SGD 2.56

1 Piece(s) 8 Day(s) or more 1/2B(15A)No

SGD 3.36

1 Piece(s) 8 Day(s) or more 1/4B(8A)No

SGD 3.36

1 Piece(s) 8 Day(s) or more 1/8B(6A)No

SGD 12.16

1 Piece(s) 8 Day(s) or more 2B(50A)No

-

1 Piece(s) 17 Day(s) or more 3B(80A)No

SGD 3.16

1 Piece(s) 8 Day(s) or more 3/4B(20A)No

SGD 3.36

1 Piece(s) 8 Day(s) or more 3/8B(10A)No

-

1 Piece(s) 17 Day(s) or more 4B(100A)No

-

1 Piece(s) 17 Day(s) or more 5B(125A)No

-

1 Piece(s) 14 Day(s) or more 6B(150A)No

SGD 8.00

1 Piece(s) 8 Day(s) or more 1 1/2B(40A)No

SGD 6.33

1 Piece(s) 8 Day(s) or more 1 1/4B(32A)No

-

1 Piece(s) 17 Day(s) or more 2 1/2B(65A)No

SGD 3.11

1 Piece(s) 8 Day(s) or more 1B(25A)Zinc Plating

SGD 2.16

1 Piece(s) 8 Day(s) or more 1/2B(15A)Zinc Plating

SGD 2.56

1 Piece(s) 8 Day(s) or more 1/4B(8A)Zinc Plating

SGD 2.56

1 Piece(s) 8 Day(s) or more 1/8B(6A)Zinc Plating

SGD 6.86

1 Piece(s) 8 Day(s) or more 2B(50A)Zinc Plating

SGD 29.87

1 Piece(s) 11 Day(s) or more 3B(80A)Zinc Plating

SGD 2.48

1 Piece(s) 8 Day(s) or more 3/4B(20A)Zinc Plating

SGD 2.56

1 Piece(s) 8 Day(s) or more 3/8B(10A)Zinc Plating

SGD 49.66

1 Piece(s) 11 Day(s) or more 4B(100A)Zinc Plating

SGD 106.11

1 Piece(s) 11 Day(s) or more 5B(125A)Zinc Plating

SGD 147.74

1 Piece(s) 11 Day(s) or more 6B(150A)Zinc Plating

SGD 4.96

1 Piece(s) 8 Day(s) or more 1 1/2B(40A)Zinc Plating

SGD 4.01

1 Piece(s) 8 Day(s) or more 1 1/4B(32A)Zinc Plating

SGD 20.51

1 Piece(s) 11 Day(s) or more 2 1/2B(65A)Zinc Plating

Loading...

  1. 1

Basic Information

Connecting Shape Socket Connection Type Screw⇔Screw Same Diameter・Different Type Material Cast Iron
Connection Thread Type M1 Rc Applicable Fluid Water / Air / Steam / Gas / Oil Type Fitting
Max. Operating Pressure(MPa) 1 Divisions of Max. Operating Pressure 1.0Mpa or Less Interior Resin Lining No
Details of Max. Operating Pressure (Vapor/Air/Gas/Oil which is 300℃ or Less)(MPa) 1.0 Details of Max. Operating Pressure (Steady Flow which is 120℃ or Less)(MPa) 2.5

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(65) 6733 7211 / FAX:(65) 6733 0211
9:00am - 6:00pm (Monday - Friday)