(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Twisted Pair Instrumentation Cable

Twisted Pair Instrumentation Cable

Twisted pair Instrumentation cable TKVVBS series

[Features]
· Superior heat resistance, oil resistance, and flexibility.
· Twisted layer types and twisted pair types are available.
· Because a twisted pair type is set at a different pitch to adjacent pairs, crosstalk noise can be reduced.
· A braided shield is provided as a noise countermeasure.
· Shield wiring work can be performed easily thanks to a drain wire of the same size as the conductor.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

 
Part Number
TKVVBS-0.2SQ-3P-1
TKVVBS-0.2SQ-3P-2
TKVVBS-0.2SQ-3P-3
TKVVBS-0.2SQ-3P-4
TKVVBS-0.2SQ-3P-5
TKVVBS-0.2SQ-3P-6
TKVVBS-0.2SQ-3P-7
TKVVBS-0.2SQ-3P-8
TKVVBS-0.2SQ-3P-9
TKVVBS-0.2SQ-3P-10
TKVVBS-0.2SQ-3P-11
TKVVBS-0.2SQ-3P-12
TKVVBS-0.2SQ-3P-13
TKVVBS-0.2SQ-3P-14
TKVVBS-0.2SQ-3P-15
TKVVBS-0.2SQ-3P-16
TKVVBS-0.2SQ-3P-17
TKVVBS-0.2SQ-3P-18
TKVVBS-0.2SQ-3P-19
TKVVBS-0.2SQ-3P-20
TKVVBS-0.2SQ-3P-21
TKVVBS-0.2SQ-3P-22
TKVVBS-0.2SQ-3P-23
TKVVBS-0.2SQ-3P-24
TKVVBS-0.2SQ-3P-25
TKVVBS-0.2SQ-3P-26
TKVVBS-0.2SQ-3P-27
TKVVBS-0.2SQ-3P-28
TKVVBS-0.2SQ-3P-29
TKVVBS-0.2SQ-3P-30
TKVVBS-0.2SQ-3P-31
TKVVBS-0.2SQ-3P-32
TKVVBS-0.2SQ-3P-33
TKVVBS-0.2SQ-3P-34
TKVVBS-0.2SQ-3P-35
TKVVBS-0.2SQ-3P-36
TKVVBS-0.2SQ-3P-37
TKVVBS-0.2SQ-3P-38
TKVVBS-0.2SQ-3P-39
TKVVBS-0.2SQ-3P-40
TKVVBS-0.2SQ-3P-41
TKVVBS-0.2SQ-3P-42
TKVVBS-0.2SQ-3P-43
TKVVBS-0.2SQ-3P-44
TKVVBS-0.2SQ-3P-45
TKVVBS-0.2SQ-3P-46
TKVVBS-0.2SQ-3P-47
TKVVBS-0.2SQ-3P-48
TKVVBS-0.2SQ-3P-49
TKVVBS-0.2SQ-3P-50
TKVVBS-0.2SQ-3P-51
TKVVBS-0.2SQ-3P-52
TKVVBS-0.2SQ-3P-53
TKVVBS-0.2SQ-3P-54
TKVVBS-0.2SQ-3P-55
TKVVBS-0.2SQ-3P-56
TKVVBS-0.2SQ-3P-57
TKVVBS-0.2SQ-3P-58
TKVVBS-0.2SQ-3P-59
TKVVBS-0.2SQ-3P-60
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipOverall Length
(m)
Conductor Cross Section
(mm2)
AWG size
(AWG)
Number Of Cores
(Core)
Logarithm Finished outer diameter
(mm)
Rated Voltage Representative Standard Grounding Wire Internal conductor configuration (number of strands/strand diameter)
(Units/mm)
Internal conductor outer diameter
(mm)
Insulation body outer diameter
(mm)

SGD 8.95

1 Piece(s) 4 Day(s) or more 10.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 17.90

1 Piece(s) 4 Day(s) or more 20.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 26.85

1 Piece(s) 4 Day(s) or more 30.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 35.81

1 Piece(s) 4 Day(s) or more 40.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 44.77

1 Piece(s) 4 Day(s) or more 50.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 53.72

1 Piece(s) 4 Day(s) or more 60.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 62.67

1 Piece(s) 4 Day(s) or more 70.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 71.62

1 Piece(s) 4 Day(s) or more 80.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 80.58

1 Piece(s) 4 Day(s) or more 90.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 47.34

1 Piece(s) 4 Day(s) or more 100.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 52.08

1 Piece(s) 4 Day(s) or more 110.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 56.83

1 Piece(s) 4 Day(s) or more 120.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 61.56

1 Piece(s) 4 Day(s) or more 130.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 66.29

1 Piece(s) 4 Day(s) or more 140.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 71.02

1 Piece(s) 4 Day(s) or more 150.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 75.76

1 Piece(s) 4 Day(s) or more 160.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 80.50

1 Piece(s) 4 Day(s) or more 170.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 85.24

1 Piece(s) 4 Day(s) or more 180.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 89.96

1 Piece(s) 4 Day(s) or more 190.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 94.70

1 Piece(s) 4 Day(s) or more 200.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 99.45

1 Piece(s) 4 Day(s) or more 210.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 104.18

1 Piece(s) 4 Day(s) or more 220.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 108.92

1 Piece(s) 4 Day(s) or more 230.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 113.64

1 Piece(s) 4 Day(s) or more 240.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 118.38

1 Piece(s) 4 Day(s) or more 250.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 123.12

1 Piece(s) 4 Day(s) or more 260.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 127.86

1 Piece(s) 4 Day(s) or more 270.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 132.58

1 Piece(s) 4 Day(s) or more 280.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 137.32

1 Piece(s) 4 Day(s) or more 290.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 142.05

1 Piece(s) 4 Day(s) or more 300.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 146.80

1 Piece(s) 4 Day(s) or more 310.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 151.54

1 Piece(s) 4 Day(s) or more 320.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 156.26

1 Piece(s) 4 Day(s) or more 330.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 161.00

1 Piece(s) 4 Day(s) or more 340.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 165.74

1 Piece(s) 4 Day(s) or more 350.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 170.48

1 Piece(s) 4 Day(s) or more 360.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 175.20

1 Piece(s) 4 Day(s) or more 370.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 179.94

1 Piece(s) 4 Day(s) or more 380.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 184.67

1 Piece(s) 4 Day(s) or more 390.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 189.42

1 Piece(s) 4 Day(s) or more 400.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 194.16

1 Piece(s) 4 Day(s) or more 410.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 198.88

1 Piece(s) 4 Day(s) or more 420.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 203.62

1 Piece(s) 4 Day(s) or more 430.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 208.35

1 Piece(s) 4 Day(s) or more 440.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 213.10

1 Piece(s) 4 Day(s) or more 450.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 217.83

1 Piece(s) 4 Day(s) or more 460.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 222.56

1 Piece(s) 4 Day(s) or more 470.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 227.29

1 Piece(s) 4 Day(s) or more 480.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 232.04

1 Piece(s) 4 Day(s) or more 490.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 230.22

1 Piece(s) 4 Day(s) or more 500.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 234.84

1 Piece(s) 4 Day(s) or more 510.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 239.44

1 Piece(s) 4 Day(s) or more 520.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 244.04

1 Piece(s) 4 Day(s) or more 530.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 248.64

1 Piece(s) 4 Day(s) or more 540.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 253.26

1 Piece(s) 4 Day(s) or more 550.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 257.86

1 Piece(s) 4 Day(s) or more 560.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 262.46

1 Piece(s) 4 Day(s) or more 570.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 267.07

1 Piece(s) 4 Day(s) or more 580.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 271.67

1 Piece(s) 4 Day(s) or more 590.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

SGD 276.28

1 Piece(s) 4 Day(s) or more 600.22463P6.1[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

Loading...

Basic Information

Shield Available Properties Oil Resistance / Heat-Resistance Sheath (outer coating) color Gray
Sheath (outer coating) material PVC (Polyvinyl Chloride) Insulation body materials PVC (Polyvinyl Chloride) Insulation body color See the catalog

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(65) 6733 7211 / FAX:(65) 6733 0211
9:00am - 6:00pm (Monday - Friday)