(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 9:00 24/11/2024 to 7:00 (SGT) 25/11/2024. We apologize for the inconvenience.
  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

AIRTAC Manual Switching Valves(Main Body Shape:Pedal Shape)

Days to Ship
  • All
  • Same day
  • 2 Day(s) or Less
  • 4 Day(s) or Less
  • 6 Day(s) or Less
  • 7 Day(s) or Less
  • 8 Day(s) or Less
  • 9 Day(s) or Less
  • 10 Day(s) or Less
  • 11 Day(s) or Less
  • 12 Day(s) or Less
  1. 1
Brand
Product Series
CAD
Days to Ship
Number of Switching Positions
Number of Ports
Switching Operation
Main Body Shape
Plumbing Thread Nominal
Pipe Port Type
Connecting Tube Diameter
Plumbing Type and Direction
Effective Sectional Area(mm2)
Mounting Method

    Foot Valve, 3F/3FM Series, 3 Port and 2 Positions

    Brand

    AIRTAC

    Product Series

    Foot Valve, 3F/3FM Series, 3 Port and 2 Positions

    CAD
    • 2D / 3D
    Days to Ship 4 Day(s) or more
    Number of Switching Positions2-Position Normally Closed
    Number of Ports3-Port
    Switching OperationFoot Switches
    Main Body ShapePedal Shape
    Plumbing Thread Nominal1/4
    Pipe Port TypeRc (R)
    Connecting Tube Diameter-
    Plumbing Type and Direction-
    Effective Sectional Area(mm2)-
    Mounting Method-

    Loading...

    1. 1

    Related Categories to Manual Switching Valves