(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.
  • Please be informed of our operating hours during the Chinese New Year Holidays. Click here for details.

CHELIC Manual Switching Valves(Plumbing Thread Nominal:3/8)

Days to Ship
  • All
  • Same day
  • 2 Day(s) or Less
  • 4 Day(s) or Less
  • 6 Day(s) or Less
  • 7 Day(s) or Less
  • 8 Day(s) or Less
  • 9 Day(s) or Less
  • 10 Day(s) or Less
  • 11 Day(s) or Less
  • 12 Day(s) or Less
  1. 1
Brand
Product Series
CAD
Days to Ship
Number of Switching Positions
Number of Ports
Switching Operation
Main Body Shape
Plumbing Thread Nominal
Pipe Port Type
Connecting Tube Diameter
Plumbing Type and Direction
Effective Sectional Area(mm2)
Mounting Method

    Manual Valve 5-Port 2 Positions / 5-Port 3 Positions [VLHL]

      Hand-operated Valve - 4 Ports 3 Positions - [VLHM]

      Brand

      CHELIC

      CHELIC

      Product Series

      Manual Valve 5-Port 2 Positions / 5-Port 3 Positions [VLHL]

      Hand-operated Valve - 4 Ports 3 Positions - [VLHM]

      CAD
      • 2D / 3D
      • 2D / 3D
      Days to Ship 12 Day(s) 18 Day(s)
      Number of Switching Positions2-Position Exhaust / 3-Position Closed Center3-Position Closed Center
      Number of Ports5-Port4-Port
      Switching OperationManual LeverManual Lever
      Main Body ShapeBlock Horizontal TypeBlock Horizontal Type
      Plumbing Thread Nominal3/83/8
      Pipe Port TypeRc (R)Rc (R)
      Connecting Tube Diameter--
      Plumbing Type and DirectionDirect Side SurfaceDirect Side Surface
      Effective Sectional Area(mm2)1817
      Mounting MethodBottomBottom

      Loading...

      1. 1

      Related Categories to Manual Switching Valves