(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

SYOWA CP Level Bands(Main Applicable Tube O.D.:40 ~ Less than 50)

Days to Ship
  • All
  • 4 Day(s) or Less
  • 5 Day(s) or Less
  • 6 Day(s) or Less
  • 7 Day(s) or Less
  • 8 Day(s) or Less
  • 9 Day(s) or Less
  • 10 Day(s) or Less
  • 11 Day(s) or Less
  • 12 Day(s) or Less
  • 14 Day(s) or Less
  1. 1
Brand
Product Series
Days to Ship
Type
Main Applicable Tube O.D.(mm)
Material
Applicable Tube Type
Surface Treatment

    Level Adjuster Clamp, LBS Super S Level Adjuster Clamp

      Roller Band, RBNP Placement Roller Band

        Roller Band, RBNP Placement Roller Band with Protective Cover

          Roller Band, RBNHK, Hanging Angled Roller Band

          Brand

          SYOWA CP

          SYOWA CP

          SYOWA CP

          SYOWA CP

          Product Series

          Level Adjuster Clamp, LBS Super S Level Adjuster Clamp

          Roller Band, RBNP Placement Roller Band

          Roller Band, RBNP Placement Roller Band with Protective Cover

          Roller Band, RBNHK, Hanging Angled Roller Band

          Days to Ship 4 Day(s) or more 8 Day(s) or more 8 Day(s) or more 8 Day(s) or more
          TypeFloor BandsRoller BandsRoller BandsRoller Bands
          Main Applicable Tube O.D.(mm)40 ~ Less than 5040 ~ Less than 5040 ~ Less than 5040 ~ Less than 50
          MaterialSteel / StainlessSteelSteelSteel
          Applicable Tube TypeStainless Steel TubesHeat Shrink Floor TubingHeat Shrink Floor TubingHeat Shrink Floor Tubing
          Surface TreatmentN/A / Uni-ChromeUni-ChromeUni-ChromeUni-Chrome

          Loading...

          1. 1

          Related Categories to Level Bands