(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.
A wide variety of standard and configurable components for factory automation engineers in industries such as automotive, semiconductor, packaging, medical and many more.
A good selection of accessories such as screws, bolts, washers and nuts that you may need for your daily engineering usage.
Browse industrial materials ranging from heat insulating plates, sponges, to metal and plastic materials in different sizes to meet your various applications.
A wide variety of wiring parts for connecting and protecting control and PC parts including Connectors, Cables, Electric Wires, Crimping Terminals and more.
A wide variety of controls and PC parts for electrical engineers including Controls, Powers, PC parts and more.
A wide variety of cutting tools for many uses and work materials including End Mills, Drills, Cutters, Reamers, Turning Tools and more.
A wide variety of tools and supplies used in processing including Machine Tools, Measurement Tools, Grinding and Polishing Supplies and more.
A wide variety of goods used in shipment, material handling and warehouse including Tape supplies, Stretch film, Truck, Shelf, Crane and more.
A large variety of goods for every kind of factories and offices including Protection items, Cleaning supplies, sanitations, office supplies and more.
A large variety of items used in R&D and Clean Room including research Equipment, Laboratory Essentials, Analysis Supplies, Clean Environment-Related Equipment and more.
Choose from thousands of standard stamping die components including Punch & Die, Gas Springs, Guide Components, Coil Springs and many more.
Browse our wide variety of mold components including Ejector Pins, Sleeves, Leader Components, Sprue Bushings and many more.
Browse our injection molding components including Heating Items, Couplers, Hoses and more.
Days to Ship |
|
---|
Fittings for Vacuum Plumbing/NW Flanged x Stainless Steel Pipe/Double Nozzle
MISUMI
This product has a SUS pipe welded to the NW flange.
[Size added] No.50 is now available.
Days to Ship: | 8 Day(s) or more |
---|
[Clean & Pack]Fittings for Vacuum Plumbing - Female Adapter
MISUMI
· Degreasing (Anti-rust single packing) | : Part Number SL-□□ |
· Precision cleaning (Degassing double packing) | : Part Number SH-□□ |
· Electrolytic polishing + precision cleaning (Degassing double packing) | : Part Number SHD-□□ |
Product Part Number | Cleaning Method | Packaging Type | Effects Compared to Uncleaned Product | Environment (Standard) | Process |
SL-□□ | Degreasing | Anti-Rust Packing | Oil Removal | General Environment | Regular Assembly Process |
Post Battery Assembly Process | |||||
SH-□□ | Precision Cleaning | Degassing Double Packing | Oil Removal Dust Removal | Clean Environment (Class 10 to 1,000) | Battery Assembly Process |
LCD-Related Post Assembly Process | |||||
In-Vehicle Camera Assembly Process | |||||
SHD-□□ | Electrolytic Polishing + Precision Cleaning | Degassing Double Packing | Oil Removal Dust Removal Outgas Reduction | Vacuum Environment Clean Environment (Class 10 to 1,000) | Pre-Semiconductor Process |
Liquid Crystal Deposition Process | |||||
Pre-OLED Process |
Can be connected to tapered tapped screw for pipe.
[Additional Size]No. 50 is now selectable.
Standard Price: | SGD 83.00- |
---|---|
Days to Ship: | 5 Day(s) or more |
[Clean & Pack]Fittings for Vacuum Plumbing - Tees
MISUMI
· Degreasing (Anti-rust single packing) | : Part Number SL-□□ |
· Precision cleaning (Degassing double packing) | : Part Number SH-□□ |
· Electrolytic polishing + precision cleaning (Degassing double packing) | : Part Number SHD-□□ |
Product Part Number | Cleaning Method | Packaging Type | Effects Compared to Uncleaned Product | Environment (Standard) | Process |
SL-□□ | Degreasing | Anti-Rust Packing | Oil Removal | General Environment | Regular Assembly Process |
Post Battery Assembly Process | |||||
SH-□□ | Precision Cleaning | Degassing Double Packing | Oil Removal Dust Removal | Clean Environment (Class 10 to 1,000) | Battery Assembly Process |
LCD-Related Post Assembly Process | |||||
In-Vehicle Camera Assembly Process | |||||
SHD-□□ | Electrolytic Polishing + Precision Cleaning | Degassing Double Packing | Oil Removal Dust Removal Outgas Reduction | Vacuum Environment Clean Environment (Class 10 to 1,000) | Pre-Semiconductor Process |
Liquid Crystal Deposition Process | |||||
Pre-OLED Process |
[Features]·A Fitting Tee for Vacuum Plumbing. [Material]·SUS304.
Standard Price: | SGD 113.00- |
---|---|
Days to Ship: | 5 Day(s) or more |
[Clean & Pack]Fittings for Vacuum Plumbing - Male Adapter
MISUMI
· Degreasing (Anti-rust single packing) | : Part Number SL-□□ |
· Precision cleaning (Degassing double packing) | : Part Number SH-□□ |
· Electrolytic polishing + precision cleaning (Degassing double packing) | : Part Number SHD-□□ |
Product Part Number | Cleaning Method | Packaging Type | Effects Compared to Uncleaned Product | Environment (Standard) | Process |
SL-□□ | Degreasing | Anti-Rust Packing | Oil Removal | General Environment | Regular Assembly Process |
Post Battery Assembly Process | |||||
SH-□□ | Precision Cleaning | Degassing Double Packing | Oil Removal Dust Removal | Clean Environment (Class 10 to 1,000) | Battery Assembly Process |
LCD-Related Post Assembly Process | |||||
In-Vehicle Camera Assembly Process | |||||
SHD-□□ | Electrolytic Polishing + Precision Cleaning | Degassing Double Packing | Oil Removal Dust Removal Outgas Reduction | Vacuum Environment Clean Environment (Class 10 to 1,000) | Pre-Semiconductor Process |
Liquid Crystal Deposition Process | |||||
Pre-OLED Process |
[Features]·A Fitting Male Adapter for Vacuum Plumbing. [Material]·SUS304.
Standard Price: | SGD 61.90- |
---|---|
Days to Ship: | 5 Day(s) or more |
[Clean & Pack]Both Sides Weld-On Vacuum Pipes - Both Ends NW Flanged
MISUMI
· Degreasing (Anti-rust single packing) | : Part Number SL-□□ |
· Precision cleaning (Degassing double packing) | : Part Number SH-□□ |
· Electrolytic polishing + precision cleaning (Degassing double packing) | : Part Number SHD-□□ |
Product Part Number | Cleaning Method | Packaging Type | Effects Compared to Uncleaned Product | Environment (Standard) | Process |
SL-□□ | Degreasing | Anti-Rust Packing | Oil Removal | General Environment | Regular Assembly Process |
Post Battery Assembly Process | |||||
SH-□□ | Precision Cleaning | Degassing Double Packing | Oil Removal Dust Removal | Clean Environment (Class 10 to 1,000) | Battery Assembly Process |
LCD-Related Post Assembly Process | |||||
In-Vehicle Camera Assembly Process | |||||
SHD-□□ | Electrolytic Polishing + Precision Cleaning | Degassing Double Packing | Oil Removal Dust Removal Outgas Reduction | Vacuum Environment Clean Environment (Class 10 to 1,000) | Pre-Semiconductor Process |
Liquid Crystal Deposition Process | |||||
Pre-OLED Process |
A SUS304 Both Sides Weld-On Vacuum Pipes.
Days to Ship: | 11 Day(s) or more |
---|
[Clean & Pack]Both Sides Weld-On Vacuum Pipes - NW Flanged × Elbow
MISUMI
· Degreasing (Anti-rust single packing) | : Part Number SL-□□ |
· Precision cleaning (Degassing double packing) | : Part Number SH-□□ |
· Electrolytic polishing + precision cleaning (Degassing double packing) | : Part Number SHD-□□ |
Product Part Number | Cleaning Method | Packaging Type | Effects Compared to Uncleaned Product | Environment (Standard) | Process |
SL-□□ | Degreasing | Anti-Rust Packing | Oil Removal | General Environment | Regular Assembly Process |
Post Battery Assembly Process | |||||
SH-□□ | Precision Cleaning | Degassing Double Packing | Oil Removal Dust Removal | Clean Environment (Class 10 to 1,000) | Battery Assembly Process |
LCD-Related Post Assembly Process | |||||
In-Vehicle Camera Assembly Process | |||||
SHD-□□ | Electrolytic Polishing + Precision Cleaning | Degassing Double Packing | Oil Removal Dust Removal Outgas Reduction | Vacuum Environment Clean Environment (Class 10 to 1,000) | Pre-Semiconductor Process |
Liquid Crystal Deposition Process | |||||
Pre-OLED Process |
Days to Ship: | 11 Day(s) or more |
---|
[Clean & Pack]Both Sides Weld-On Vacuum Pipes - NW Flanged × Tees
MISUMI
· Degreasing (Anti-rust single packing) | : Part Number SL-□□ |
· Precision cleaning (Degassing double packing) | : Part Number SH-□□ |
· Electrolytic polishing + precision cleaning (Degassing double packing) | : Part Number SHD-□□ |
Product Part Number | Cleaning Method | Packaging Type | Effects Compared to Uncleaned Product | Environment (Standard) | Process |
SL-□□ | Degreasing | Anti-Rust Packing | Oil Removal | General Environment | Regular Assembly Process |
Post Battery Assembly Process | |||||
SH-□□ | Precision Cleaning | Degassing Double Packing | Oil Removal Dust Removal | Clean Environment (Class 10 to 1,000) | Battery Assembly Process |
LCD-Related Post Assembly Process | |||||
In-Vehicle Camera Assembly Process | |||||
SHD-□□ | Electrolytic Polishing + Precision Cleaning | Degassing Double Packing | Oil Removal Dust Removal Outgas Reduction | Vacuum Environment Clean Environment (Class 10 to 1,000) | Pre-Semiconductor Process |
Liquid Crystal Deposition Process | |||||
Pre-OLED Process |
Days to Ship: | 11 Day(s) or more |
---|
[Clean & Pack]Both Sides Weld-On Vacuum Pipes - NW Flanged × VF Flanged
MISUMI
· Degreasing (Anti-rust single packing) | : Part Number SL-□□ |
· Precision cleaning (Degassing double packing) | : Part Number SH-□□ |
· Electrolytic polishing + precision cleaning (Degassing double packing) | : Part Number SHD-□□ |
Product Part Number | Cleaning Method | Packaging Type | Effects Compared to Uncleaned Product | Environment (Standard) | Process |
SL-□□ | Degreasing | Anti-Rust Packing | Oil Removal | General Environment | Regular Assembly Process |
Post Battery Assembly Process | |||||
SH-□□ | Precision Cleaning | Degassing Double Packing | Oil Removal Dust Removal | Clean Environment (Class 10 to 1,000) | Battery Assembly Process |
LCD-Related Post Assembly Process | |||||
In-Vehicle Camera Assembly Process | |||||
SHD-□□ | Electrolytic Polishing + Precision Cleaning | Degassing Double Packing | Oil Removal Dust Removal Outgas Reduction | Vacuum Environment Clean Environment (Class 10 to 1,000) | Pre-Semiconductor Process |
Liquid Crystal Deposition Process | |||||
Pre-OLED Process |
Standard Price: | SGD 218.40- |
---|---|
Days to Ship: | 5 Day(s) or more |
[Clean & Pack]Both Sides Weld-On Vacuum Pipes - NW Flanged × VG Flanged
MISUMI
· Degreasing (Anti-rust single packing) | : Part Number SL-□□ |
· Precision cleaning (Degassing double packing) | : Part Number SH-□□ |
· Electrolytic polishing + precision cleaning (Degassing double packing) | : Part Number SHD-□□ |
Product Part Number | Cleaning Method | Packaging Type | Effects Compared to Uncleaned Product | Environment (Standard) | Process |
SL-□□ | Degreasing | Anti-Rust Packing | Oil Removal | General Environment | Regular Assembly Process |
Post Battery Assembly Process | |||||
SH-□□ | Precision Cleaning | Degassing Double Packing | Oil Removal Dust Removal | Clean Environment (Class 10 to 1,000) | Battery Assembly Process |
LCD-Related Post Assembly Process | |||||
In-Vehicle Camera Assembly Process | |||||
SHD-□□ | Electrolytic Polishing + Precision Cleaning | Degassing Double Packing | Oil Removal Dust Removal Outgas Reduction | Vacuum Environment Clean Environment (Class 10 to 1,000) | Pre-Semiconductor Process |
Liquid Crystal Deposition Process | |||||
Pre-OLED Process |
Standard Price: | SGD 218.40- |
---|---|
Days to Ship: | 5 Day(s) or more |
[Clean & Pack]Fittings for Vacuum Plumbing - Duct Adapter
MISUMI
· Degreasing (Anti-rust single packing) | : Part Number SL-□□ |
· Precision cleaning (Degassing double packing) | : Part Number SH-□□ |
· Electrolytic polishing + precision cleaning (Degassing double packing) | : Part Number SHD-□□ |
Product Part Number | Cleaning Method | Packaging Type | Effects Compared to Uncleaned Product | Environment (Standard) | Process |
SL-□□ | Degreasing | Anti-Rust Packing | Oil Removal | General Environment | Regular Assembly Process |
Post Battery Assembly Process | |||||
SH-□□ | Precision Cleaning | Degassing Double Packing | Oil Removal Dust Removal | Clean Environment (Class 10 to 1,000) | Battery Assembly Process |
LCD-Related Post Assembly Process | |||||
In-Vehicle Camera Assembly Process | |||||
SHD-□□ | Electrolytic Polishing + Precision Cleaning | Degassing Double Packing | Oil Removal Dust Removal Outgas Reduction | Vacuum Environment Clean Environment (Class 10 to 1,000) | Pre-Semiconductor Process |
Liquid Crystal Deposition Process | |||||
Pre-OLED Process |
Can be connected to the exhaust port of a vacuum pump to attach a duct hose, etc.
[Additional Size]No. 40 is now selectable.
Standard Price: | SGD 116.40- |
---|---|
Days to Ship: | 5 Day(s) or more |
[Clean & Pack]Fittings for Vacuum Plumbing - NW Blind Flanged
MISUMI
· Degreasing (Anti-rust single packing) | : Part Number SL-□□ |
· Precision cleaning (Degassing double packing) | : Part Number SH-□□ |
· Electrolytic polishing + precision cleaning (Degassing double packing) | : Part Number SHD-□□ |
Product Part Number | Cleaning Method | Packaging Type | Effects Compared to Uncleaned Product | Environment (Standard) | Process |
SL-□□ | Degreasing | Anti-Rust Packing | Oil Removal | General Environment | Regular Assembly Process |
Post Battery Assembly Process | |||||
SH-□□ | Precision Cleaning | Degassing Double Packing | Oil Removal Dust Removal | Clean Environment (Class 10 to 1,000) | Battery Assembly Process |
LCD-Related Post Assembly Process | |||||
In-Vehicle Camera Assembly Process | |||||
SHD-□□ | Electrolytic Polishing + Precision Cleaning | Degassing Double Packing | Oil Removal Dust Removal Outgas Reduction | Vacuum Environment Clean Environment (Class 10 to 1,000) | Pre-Semiconductor Process |
Liquid Crystal Deposition Process | |||||
Pre-OLED Process |
Standard Price: | SGD 19.20- |
---|---|
Days to Ship: | 5 Day(s) or more |
[Clean & Pack]Fittings for Vacuum Plumbing - NW Long Flanged
MISUMI
· Degreasing (Anti-rust single packing) | : Part Number SL-□□ |
· Precision cleaning (Degassing double packing) | : Part Number SH-□□ |
· Electrolytic polishing + precision cleaning (Degassing double packing) | : Part Number SHD-□□ |
Product Part Number | Cleaning Method | Packaging Type | Effects Compared to Uncleaned Product | Environment (Standard) | Process |
SL-□□ | Degreasing | Anti-Rust Packing | Oil Removal | General Environment | Regular Assembly Process |
Post Battery Assembly Process | |||||
SH-□□ | Precision Cleaning | Degassing Double Packing | Oil Removal Dust Removal | Clean Environment (Class 10 to 1,000) | Battery Assembly Process |
LCD-Related Post Assembly Process | |||||
In-Vehicle Camera Assembly Process | |||||
SHD-□□ | Electrolytic Polishing + Precision Cleaning | Degassing Double Packing | Oil Removal Dust Removal Outgas Reduction | Vacuum Environment Clean Environment (Class 10 to 1,000) | Pre-Semiconductor Process |
Liquid Crystal Deposition Process | |||||
Pre-OLED Process |
Standard Price: | SGD 28.50- |
---|---|
Days to Ship: | 5 Day(s) or more |
[Clean & Pack]Fittings for Vacuum Plumbing - NW Flanged × Stainless Steel Pipe, Double Nozzle
MISUMI
· Degreasing (Anti-rust single packing) | : Part Number SL-□□ |
· Precision cleaning (Degassing double packing) | : Part Number SH-□□ |
· Electrolytic polishing + precision cleaning (Degassing double packing) | : Part Number SHD-□□ |
Product Part Number | Cleaning Method | Packaging Type | Effects Compared to Uncleaned Product | Environment (Standard) | Process |
SL-□□ | Degreasing | Anti-Rust Packing | Oil Removal | General Environment | Regular Assembly Process |
Post Battery Assembly Process | |||||
SH-□□ | Precision Cleaning | Degassing Double Packing | Oil Removal Dust Removal | Clean Environment (Class 10 to 1,000) | Battery Assembly Process |
LCD-Related Post Assembly Process | |||||
In-Vehicle Camera Assembly Process | |||||
SHD-□□ | Electrolytic Polishing + Precision Cleaning | Degassing Double Packing | Oil Removal Dust Removal Outgas Reduction | Vacuum Environment Clean Environment (Class 10 to 1,000) | Pre-Semiconductor Process |
Liquid Crystal Deposition Process | |||||
Pre-OLED Process |
Days to Ship: | 11 Day(s) or more |
---|
[Clean & Pack]Both Sides Weld-On Vacuum Pipes - NW Flanged × Threaded
MISUMI
· Degreasing (Anti-rust single packing) | : Part Number SL-□□ |
· Precision cleaning (Degassing double packing) | : Part Number SH-□□ |
· Electrolytic polishing + precision cleaning (Degassing double packing) | : Part Number SHD-□□ |
Product Part Number | Cleaning Method | Packaging Type | Effects Compared to Uncleaned Product | Environment (Standard) | Process |
SL-□□ | Degreasing | Anti-Rust Packing | Oil Removal | General Environment | Regular Assembly Process |
Post Battery Assembly Process | |||||
SH-□□ | Precision Cleaning | Degassing Double Packing | Oil Removal Dust Removal | Clean Environment (Class 10 to 1,000) | Battery Assembly Process |
LCD-Related Post Assembly Process | |||||
In-Vehicle Camera Assembly Process | |||||
SHD-□□ | Electrolytic Polishing + Precision Cleaning | Degassing Double Packing | Oil Removal Dust Removal Outgas Reduction | Vacuum Environment Clean Environment (Class 10 to 1,000) | Pre-Semiconductor Process |
Liquid Crystal Deposition Process | |||||
Pre-OLED Process |
Days to Ship: | 11 Day(s) or more |
---|
[Clean & Pack]Fittings for Vacuum Plumbing - Hose Adapter
MISUMI
· Degreasing (Anti-rust single packing) | : Part Number SL-□□ |
· Precision cleaning (Degassing double packing) | : Part Number SH-□□ |
· Electrolytic polishing + precision cleaning (Degassing double packing) | : Part Number SHD-□□ |
Product Part Number | Cleaning Method | Packaging Type | Effects Compared to Uncleaned Product | Environment (Standard) | Process |
SL-□□ | Degreasing | Anti-Rust Packing | Oil Removal | General Environment | Regular Assembly Process |
Post Battery Assembly Process | |||||
SH-□□ | Precision Cleaning | Degassing Double Packing | Oil Removal Dust Removal | Clean Environment (Class 10 to 1,000) | Battery Assembly Process |
LCD-Related Post Assembly Process | |||||
In-Vehicle Camera Assembly Process | |||||
SHD-□□ | Electrolytic Polishing + Precision Cleaning | Degassing Double Packing | Oil Removal Dust Removal Outgas Reduction | Vacuum Environment Clean Environment (Class 10 to 1,000) | Pre-Semiconductor Process |
Liquid Crystal Deposition Process | |||||
Pre-OLED Process |
Standard Price: | SGD 174.50- |
---|---|
Days to Ship: | 6 Day(s) or more |
Standard Price: | SGD 68.95 |
---|---|
Days to Ship: | 4 Day(s) or more |
MIRAPRO
The connection pipe uses JIS standard sizes (outer diameter 20mm, thickness 2mm pipe on KF16 only). The sealing surface of the flange is protected by a cap and tape.
Standard Price: | SGD 88.07 |
---|---|
Days to Ship: | 4 Day(s) or more |
MIRAPRO
NW flange branch conversion fitting for vacuum piping.
[Features]
·A wide variety of variations are available from KF10 to KF100.
·By retrofitting, it is possible to easily branch the vacuum piping.
·NW tee for vacuum piping.
[Applications]
·Fitting for easily and inexpensively branching a vacuum piping line with a NW flange shape.
Standard Price: | SGD 107.42 |
---|---|
Days to Ship: | 4 Day(s) or more |
Standard Price: | SGD 125.58 |
---|---|
Days to Ship: | 4 Day(s) or more |
Standard Price: | SGD 109.38 |
---|---|
Days to Ship: | 4 Day(s) or more |
ADVANTEC(VACUUM PIPING)
An NW elbow—manufactured by Advantec Co., Ltd. (vacuum piping), with a top-class track record in Japan in the field of vacuum components requiring high-performance seals. We have a large selection in stock, from NW10 to large-diameter sizes.
Standard Price: | SGD 76.88 |
---|---|
Days to Ship: | 4 Day(s) or more |
ADVANTEC(VACUUM PIPING)
[Features]
· Products conforming to special dimensions can be fabricated
Standard Price: | SGD 114.26 |
---|---|
Days to Ship: | 4 Day(s) or more |
ADVANTEC(VACUUM PIPING)
[Features]
· With SUS316L, please indicate "-6L" at the end of the part number (or 316L).
· Products of special dimensions can be manufactured.
Standard Price: | SGD 154.37 |
---|---|
Days to Ship: | 4 Day(s) or more |
Adapter Series, NW Gauge Port with Flange
ADVANTEC(VACUUM PIPING)
High-quality, fast delivery, and low-cost.
Standard Price: | SGD 117.16 |
---|---|
Days to Ship: | 4 Day(s) or more |
COSMOTEC
Variety of reliable Cosmotec products are available.
[Features]
· Standard parts of various sizes of short and long flanges for welding in addition to blank flanges for sealing and machining are available.
· Are also able to provide in SUS316L.
Standard Price: | SGD 16.20 |
---|---|
Days to Ship: | 4 Day(s) or more |
COSMOTEC
A wide array of Cosmotec products is available. Realizing reassuring and reliable manufacturing.
[Features]
· Used to adjust the length of pipes, etc.
· NW/KF to NW/KF50 were standardized to a length of 100 mm.
· Offers standard conversion nipples as standard.
· We respond quickly to custom orders including changes to L dimensions, etc.
Standard Price: | SGD 73.11 |
---|---|
Days to Ship: | 7 Day(s) or more |
COSMOTEC
Variety of reliable Cosmotec products are available.
[Features]
· Used to change the angle of pipes, for example.
· NW/KF16-NW/KF50 are standardized.
· We respond quickly to a request for customization such as change in dimensions.
Standard Price: | SGD 102.45 |
---|---|
Days to Ship: | 7 Day(s) or more |
COSMOTEC
Variety of reliable Cosmotec products are available.
[Features]
· For ports of vacuum gauges (mounting ports, exhaust connection ports, etc.)
· NW/KF16-NW/KF50 are standardized.
· Replacement crosses with two flanges different in size from the other two are also available as standard products.
· The 6-direction cross enables the use of whatever variation comes to mind.
· We respond quickly to a request for customization such as change in dimensions.
Standard Price: | SGD 634.82 |
---|---|
Days to Ship: | 7 Day(s) or more |
NW/KF Standard Nipple Leak Port
COSMOTEC
It is mainly used for vacuum breaking.
[Features]
・ NW / KF16 to NW / KF50 are standardized
[Applications]
・ It is used for vacuum vessel piping system
Standard Price: | SGD 383.30 |
---|---|
Days to Ship: | 7 Day(s) or more |
NW/KF Standard Liquid-Cooling/Gas Introduction Machine LF
COSMOTEC
Variety of reliable Cosmotec products are available.
[Features]
· NW/KF: flange for ICF standard liquid cooling/gas introduction.
· NW/KF16-NW/KF50 and ICF34 to ICF70 are available as standard products.
· Types of fittings available or s-tube end, Swagelok®, and VCR.
· 1/4 inch is the standard size but 3/8 inch, 1/2 inch, and mm sizes can also be supported.
· We will also provide mounting for JISVF/VG standard.
· Special order items such as different lengths can also be provided.
Standard Price: | SGD 148.56- |
---|---|
Days to Ship: | 10 Day(s) or more |
Brand |
---|
Product Series |
CAD |
Days to Ship |
Pipe O.D.(mm) |
I.D.(mm) |
Type |
Flange Shape |
Flange Type |
Fitting Type |
Material |
Flange Size (Nominal) |
Flange Size Small Dia. or Conversion Destination Dia. |
Adaptor Type |
Standard |
Equal Dia. / Unequal Dia. |
Cleaning Method |
Characteristics/Applications |
Environmentally friendly |
Brand | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MIRAPRO | MIRAPRO | MIRAPRO | MIRAPRO | MIRAPRO | ADVANTEC(VACUUM PIPING) | ADVANTEC(VACUUM PIPING) | ADVANTEC(VACUUM PIPING) | ADVANTEC(VACUUM PIPING) | COSMOTEC | COSMOTEC | COSMOTEC | COSMOTEC | COSMOTEC | COSMOTEC |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Product Series | Fittings for Vacuum Plumbing/NW Flanged x Stainless Steel Pipe/Double Nozzle | [Clean & Pack]Both Sides Weld-On Vacuum Pipes - Both Ends NW Flanged | [Clean & Pack]Both Sides Weld-On Vacuum Pipes - NW Flanged × Elbow | [Clean & Pack]Both Sides Weld-On Vacuum Pipes - NW Flanged × Tees | [Clean & Pack]Both Sides Weld-On Vacuum Pipes - NW Flanged × VF Flanged | [Clean & Pack]Both Sides Weld-On Vacuum Pipes - NW Flanged × VG Flanged | [Clean & Pack]Fittings for Vacuum Plumbing - NW Blind Flanged | [Clean & Pack]Fittings for Vacuum Plumbing - NW Long Flanged | [Clean & Pack]Fittings for Vacuum Plumbing - NW Flanged × Stainless Steel Pipe, Double Nozzle | [Clean & Pack]Both Sides Weld-On Vacuum Pipes - NW Flanged × Threaded | ||||||||||||||||||||
CAD |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||||||
Days to Ship | 8 Day(s) or more | 5 Day(s) or more | 5 Day(s) or more | 5 Day(s) or more | 11 Day(s) or more | 11 Day(s) or more | 11 Day(s) or more | 5 Day(s) or more | 5 Day(s) or more | 5 Day(s) or more | 5 Day(s) or more | 5 Day(s) or more | 11 Day(s) or more | 11 Day(s) or more | 6 Day(s) or more | 4 Day(s) or more | 4 Day(s) or more | 4 Day(s) or more | 4 Day(s) or more | 4 Day(s) or more | 4 Day(s) or more | 4 Day(s) or more | 4 Day(s) or more | 4 Day(s) or more | 4 Day(s) or more | 7 Day(s) or more | 7 Day(s) or more | 7 Day(s) or more | 7 Day(s) or more | 10 Day(s) or more |
Pipe O.D.(mm) | - | - | 21.7 | 10.5 | 21.7 | 21.7 | 21.7 | 21.7 | 21.7 | - | 30 | 21.7 | - | 10.5 | - | 20 | 21.7 | 20 | 20 | - | 21.7 | 21.7 | 21.7 | - | - | 21.7 | 21.7 | 19.1 | - | - |
I.D.(mm) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 16 | 16 | 16 | 16 | - | 17.5 | 16 | 15.8 | - | - |
Type | Fitting | Adapter | Fitting | Adapter | Fitting | Fitting | Fitting | Adapter | Adapter | Adapter | Flange | Flange | Fitting | Adapter | Adapter | Fitting | Fitting | Fitting | Fitting | Adapter | Fitting | Fitting | Fitting | Adapter | Flange | Fitting | Fitting | Fitting | Adapter | Flange |
Flange Shape | - | - | - | - | - | - | - | - | - | - | Blank | Standard | Flanges with Introduction Pipe | - | - | - | - | - | - | - | - | - | - | - | Blank | - | - | - | - | Flanges with Introduction Pipe |
Flange Type | - | - | - | - | - | - | - | - | - | - | Others | Long | Others | - | - | - | - | - | - | - | - | - | - | - | Others | - | - | - | - | Others |
Fitting Type | Others | Reducers | Tees | Reducers | Nipples | Elbows | Tees | Reducers | Reducers | Reducers | - | - | Others | Reducers | Reducers | Nipples | Elbows | Tees | Cross | - | Elbows | Tees | Cross | - | - | Nipples | Elbows | Cross | - | - |
Material | SUS304 | SUS304 | SUS304 | SUS304 | SUS304 | SUS304 | SUS304 | SUS304 | SUS304 | SUS304 | SUS304 | SUS304 | SUS304 | SUS304 | SUS304 | SUS304 | SUS304 | SUS304 | SUS304 | SUS304 | SUS304 | SUS304 | SUS304 | SUS304 | SUS304 | SUS304 | SUS304 | SUS304 | SUS304 | SUS304 |
Flange Size (Nominal) | NW(KF)16 | NW(KF)16 | NW(KF)16 | NW(KF)16 | NW(KF)16 | NW(KF)16 | NW(KF)16 | NW(KF)16 | NW(KF)16 | NW(KF)16 | NW(KF)16 | NW(KF)16 | NW(KF)16 | NW(KF)16 | NW(KF)16 | NW(KF)16 | NW(KF)16 | NW(KF)16 | NW(KF)16 | NW(KF)16 | NW(KF)16 | NW(KF)16 | NW(KF)16 | NW(KF)16 | NW(KF)16 | NW(KF)16 | NW(KF)16 | NW(KF)16 | NW(KF)16 | NW(KF)16 |
Flange Size Small Dia. or Conversion Destination Dia. | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | NW(KF)16 | - | - |
Adaptor Type | - | Screws | - | Screws | - | - | - | For Standard Conversion | For Standard Conversion | For Rubber Pipe and Tube Installation | - | - | - | Screws | For Rubber Pipe and Tube Installation | - | - | - | - | Leak Port | - | - | - | Gage Ports | - | - | - | - | Leak Port | - |
Standard | - | NW/KF Standard | NW/KF Standard | NW/KF Standard | NW/KF Standard | NW/KF Standard | NW/KF Standard | NW/KF Standard | NW/KF Standard | NW/KF Standard | NW/KF Standard | NW/KF Standard | NW/KF Standard | NW/KF Standard | NW/KF Standard | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
Equal Dia. / Unequal Dia. | - | Unequal Dia. | Equal Dia. | Unequal Dia. | Equal Dia. | Equal Dia. | Equal Dia. | Unequal Dia. | Unequal Dia. | Unequal Dia. | Equal Dia. | Equal Dia. | Equal Dia. | Unequal Dia. | Unequal Dia. | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
Cleaning Method | - | Degreasing / Precision Cleaning / Electrolytic Polishing + Precision Cleaning | Degreasing / Precision Cleaning / Electrolytic Polishing + Precision Cleaning | Degreasing / Precision Cleaning / Electrolytic Polishing + Precision Cleaning | Degreasing / Precision Cleaning / Electrolytic Polishing + Precision Cleaning | Degreasing / Precision Cleaning / Electrolytic Polishing + Precision Cleaning | Degreasing / Precision Cleaning / Electrolytic Polishing + Precision Cleaning | Degreasing / Precision Cleaning / Electrolytic Polishing + Precision Cleaning | Degreasing / Precision Cleaning / Electrolytic Polishing + Precision Cleaning | Degreasing / Precision Cleaning / Electrolytic Polishing + Precision Cleaning | Degreasing / Precision Cleaning / Electrolytic Polishing + Precision Cleaning | Degreasing / Precision Cleaning / Electrolytic Polishing + Precision Cleaning | Degreasing / Precision Cleaning / Electrolytic Polishing + Precision Cleaning | Degreasing / Precision Cleaning / Electrolytic Polishing + Precision Cleaning | Degreasing / Precision Cleaning / Electrolytic Polishing + Precision Cleaning | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
Characteristics/Applications | - | Clean washed | Clean washed | Clean washed | Clean washed | Clean washed | Clean washed | Clean washed | Clean washed | Clean washed | Clean washed | Clean washed | Clean washed | Clean washed | Clean washed | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
Environmentally friendly | - | RoHS Compliant (10 Substances) | RoHS Compliant (10 Substances) | RoHS Compliant (10 Substances) | RoHS Compliant (10 Substances) | RoHS Compliant (10 Substances) | RoHS Compliant (10 Substances) | RoHS Compliant (10 Substances) | RoHS Compliant (10 Substances) | RoHS Compliant (10 Substances) | RoHS Compliant (10 Substances) | RoHS Compliant (10 Substances) | RoHS Compliant (10 Substances) | RoHS Compliant (10 Substances) | RoHS Compliant (10 Substances) | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
Loading...
How can we improve?
How can we improve?