(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.
A wide variety of standard and configurable components for factory automation engineers in industries such as automotive, semiconductor, packaging, medical and many more.
A good selection of accessories such as screws, bolts, washers and nuts that you may need for your daily engineering usage.
Browse industrial materials ranging from heat insulating plates, sponges, to metal and plastic materials in different sizes to meet your various applications.
A wide variety of wiring parts for connecting and protecting control and PC parts including Connectors, Cables, Electric Wires, Crimping Terminals and more.
A wide variety of controls and PC parts for electrical engineers including Controls, Powers, PC parts and more.
A wide variety of cutting tools for many uses and work materials including End Mills, Drills, Cutters, Reamers, Turning Tools and more.
A wide variety of tools and supplies used in processing including Machine Tools, Measurement Tools, Grinding and Polishing Supplies and more.
A wide variety of goods used in shipment, material handling and warehouse including Tape supplies, Stretch film, Truck, Shelf, Crane and more.
A large variety of goods for every kind of factories and offices including Protection items, Cleaning supplies, sanitations, office supplies and more.
A large variety of items used in R&D and Clean Room including research Equipment, Laboratory Essentials, Analysis Supplies, Clean Environment-Related Equipment and more.
Choose from thousands of standard stamping die components including Punch & Die, Gas Springs, Guide Components, Coil Springs and many more.
Browse our wide variety of mold components including Ejector Pins, Sleeves, Leader Components, Sprue Bushings and many more.
Browse our injection molding components including Heating Items, Couplers, Hoses and more.
The spiral flute tap is ideal for machining blind holes as cutting chip is discharged from the grooves twisted in the same direction as the threads.
[Features]
・ The grooves are twisted in the same direction as the threads for not only good scrap discharging performance but also great cutting performance.
・ Intermittent cutting of female threads with keyway is also possible.
・ Capable of machining both synchronously and asynchronously.
・ Ideal for machining blind holds as the groove is twisted, continuous small coiled scraps are discharged to the rear, and it does not cause cutting chip clogging.
・ Ideal for tapping especially sticky work materials, plastics, etc. due to its sharpness.
・ The tap can easily cut.
・ Intermittent cutting of pilot holes with keyway is also possible.
・ Since the blade strength is inferior to HT, the HT shape is more suitable for hard materials.
[Applications]
・ Ideal for machining blind holes.
Japanese Only
Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Days to Ship | Screw Types | Nominal | Pitch, Number of Threading (mm) | Overall Length (L) (mm) | Class | Thread Length (mm) | Length under neck (mm) | Shank diameter (Ds) (mm) | Shank square width (K) (mm) | Shank square part length (mm) | Number of Grooves | Shape | Torsional Angle |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
SGD 17.05 | 1 Piece(s) | 9 Day(s) | Meter | M4 | 0.5 | 52 | P1 | 9 | 17 | 5 | 4 | 7 | 3 | c | 40° | ||
SGD 17.05 | 1 Piece(s) | 9 Day(s) | Meter | M5 | 0.5 | 60 | P1 | 9 | 22 | 5.5 | 4.5 | 7 | 3 | c | 40° | ||
SGD 18.03 | 1 Piece(s) | 9 Day(s) | Meter | M6 | 0.75 | 62 | P2 | 15 | 26 | 6 | 4.5 | 7 | 3 | c | 40° | ||
SGD 16.94 | 1 Piece(s) | 8 Day(s) | Meter | M6 | 0.5 | 55 | P1 | 13 | 25 | 6 | 4.5 | 7 | 3 | c | 40° | ||
SGD 32.12 | 1 Piece(s) | 9 Day(s) | Meter | M10 | 0.75 | 75 | P2 | 22 | - | 7 | 5.5 | 8 | 3 | e | 40° | ||
SGD 20.79 | 1 Piece(s) | 9 Day(s) | Meter | M10 | 1.25 | 75 | P2 | 24 | - | 7 | 5.5 | 8 | 3 | e | 40° | ||
SGD 50.56 | 1 Piece(s) | 9 Day(s) | Meter | M14 | 1 | 88 | P2 | 30 | - | 10.5 | 8 | 11 | 3 | e | 40° | ||
SGD 50.56 | 1 Piece(s) | 9 Day(s) | Meter | M14 | 1.25 | 88 | P2 | 30 | - | 10.5 | 8 | 11 | 3 | e | 40° | ||
SGD 69.59 | 1 Piece(s) | 9 Day(s) | Meter | M16 | 1 | 95 | P2 | 32 | - | 12.5 | 10 | 13 | 3 | e | 40° | ||
SGD 99.13 | 1 Piece(s) | 9 Day(s) | Meter | M18 | 1 | 95 | P2 | 30 | - | 14 | 11 | 14 | 4 | e | 40° | ||
SGD 131.30 | 1 Piece(s) | 9 Day(s) | Meter | M20 | 1 | 95 | P2 | 30 | - | 15 | 12 | 15 | 4 | e | 40° | ||
SGD 170.56 | 1 Piece(s) | 9 Day(s) | Meter | M22 | 1 | 95 | P2 | 30 | - | 17 | 13 | 16 | 4 | e | 40° | ||
SGD 210.89 | 1 Piece(s) | 9 Day(s) | Meter | M24 | 1 | 95 | P2 | 30 | - | 19 | 15 | 18 | 4 | e | 40° | ||
SGD 25.13 | 1 Piece(s) | 9 Day(s) | Meter | M1.7 | 0.35 | 36 | P2 | 8 | - | 3 | 2.5 | 5 | 2 | p | 40° | ||
SGD 16.94 | 1 Piece(s) | 9 Day(s) | Meter | M2.5 | 0.45 | 44 | P2 | 9.5 | 16 | 3 | 2.5 | 5 | 2 | c | 40° | ||
SGD 15.44 | 1 Piece(s) | 9 Day(s) | Meter | M2.6 | 0.45 | 44 | P2 | 9.5 | 16 | 3 | 2.5 | 5 | 2 | c | 40° | ||
SGD 15.44 | 1 Piece(s) | 9 Day(s) | Meter | M7 | 1 | 65 | P2 | 19 | - | 6.2 | 5 | 8 | 3 | e | 40° | ||
SGD 27.56 | 1 Piece(s) | 9 Day(s) | Meter | M8 | 0.5 | 55 | P2 | 13 | - | 6.2 | 5 | 8 | 3 | e | 40° | ||
SGD 22.34 | 1 Piece(s) | 9 Day(s) | Meter | M8 | 0.75 | 70 | P2 | 22 | - | 6.2 | 5 | 8 | 3 | e | 40° | ||
SGD 31.92 | 1 Piece(s) | 9 Day(s) | Meter | M9 | 0.75 | 72 | P2 | 22 | - | 7 | 5.5 | 8 | 3 | e | 40° | ||
SGD 26.42 | 1 Piece(s) | 9 Day(s) | Meter | M9 | 1 | 72 | P2 | 22 | - | 7 | 5.5 | 8 | 3 | e | 40° | ||
SGD 14.16 | 1 Piece(s) | 9 Day(s) | unified | 1/4 | - | 62 | P2 | 19 | 30 | 6 | 4.5 | 7 | 3 | c | 40° | ||
SGD 19.98 | 1 Piece(s) | 9 Day(s) | unified | 5/16 | - | 70 | P2 | 22 | - | 6.1 | 5 | 8 | 3 | e | 40° | ||
SGD 20.73 | 1 Piece(s) | 9 Day(s) | unified | 5/16 | 18 | 70 | P2 | 22 | - | 6.1 | 5 | 8 | 3 | e | 40° | ||
SGD 25.86 | 1 Piece(s) | 9 Day(s) | unified | 3/8 | - | 75 | P2 | 24 | - | 7 | 5.5 | 8 | 3 | e | 40° | ||
SGD 25.86 | 1 Piece(s) | 9 Day(s) | unified | 3/8 | - | 75 | P2 | 24 | - | 7 | 5.5 | 8 | 3 | e | 40° | ||
SGD 36.44 | 1 Piece(s) | 9 Day(s) | unified | 7/16 | - | 80 | P2 | 25 | - | 8 | 6 | 9 | 3 | e | 40° | ||
SGD 39.16 | 1 Piece(s) | 9 Day(s) | unified | 1/2 | - | 85 | P2 | 29 | - | 9 | 7 | 10 | 3 | e | 40° | ||
SGD 58.06 | 1 Piece(s) | 9 Day(s) | unified | 9/16 | - | 90 | P2 | 30 | - | 10.5 | 8 | 11 | 3 | e | 40° | ||
SGD 58.72 | 1 Piece(s) | 9 Day(s) | unified | 5/8 | - | 95 | P2 | 32 | - | 12 | 9 | 12 | 3 | e | 40° | ||
SGD 13.00 | 1 Piece(s) | 9 Day(s) | Whitworth | 3/16 | - | 60 | P2 | 16 | 25 | 5.5 | 4.5 | 7 | 3 | c | 40° | ||
SGD 13.98 | 1 Piece(s) | 9 Day(s) | Whitworth | 1/4 | - | 62 | P2 | 19 | 30 | 6 | 4.5 | 7 | 3 | c | 40° | ||
SGD 19.56 | 1 Piece(s) | 9 Day(s) | Whitworth | 5/16 | - | 70 | P2 | 22 | - | 6.1 | 5 | 8 | 3 | e | 40° | ||
SGD 25.17 | 1 Piece(s) | 9 Day(s) | Whitworth | 3/8 | - | 75 | P2 | 24 | - | 7 | 5.5 | 8 | 3 | e | 40° | ||
SGD 22.48 | 1 Piece(s) | 9 Day(s) | Meter | M10 | 1.25 | 75 | P3 | 24 | - | 7 | 5.5 | 8 | 3 | e | 40° | ||
SGD 32.04 | 1 Piece(s) | 9 Day(s) | Meter | M12 | 1.25 | 82 | P3 | 29 | - | 8.5 | 6.5 | 9 | 3 | e | 40° | ||
SGD 32.04 | 1 Piece(s) | 9 Day(s) | Meter | M12 | 1.75 | 82 | P3 | 29 | - | 8.5 | 6.5 | 9 | 3 | e | 40° | ||
SGD 74.43 | 1 Piece(s) | 9 Day(s) | Meter | M18 | 2.5 | 100 | P3 | 37 | - | 14 | 11 | 14 | 4 | e | 40° | ||
SGD 104.26 | 1 Piece(s) | 9 Day(s) | Meter | M20 | 2 | 105 | P3 | 37 | - | 15 | 12 | 15 | 4 | e | 40° | ||
SGD 134.36 | 1 Piece(s) | 9 Day(s) | Meter | M22 | 2.5 | 115 | P3 | 38 | - | 17 | 13 | 16 | 4 | e | 40° | ||
SGD 167.39 | 1 Piece(s) | 9 Day(s) | Meter | M24 | 1.5 | 120 | P3 | 45 | - | 19 | 15 | 18 | 4 | e | 40° | ||
SGD 167.39 | 1 Piece(s) | 9 Day(s) | Meter | M24 | 2 | 120 | P3 | 45 | - | 19 | 15 | 18 | 4 | e | 40° | ||
SGD 219.44 | 1 Piece(s) | 9 Day(s) | Meter | M25 | 1.5 | 125 | P3 | 45 | - | 19 | 15 | 18 | 4 | e | 40° | ||
SGD 236.87 | 1 Piece(s) | 9 Day(s) | Meter | M26 | 1.5 | 125 | P3 | 45 | - | 20 | 15 | 18 | 4 | e | 40° | ||
SGD 238.07 | 1 Piece(s) | 9 Day(s) | Meter | M27 | 1.5 | 130 | P3 | 45 | - | 20 | 15 | 18 | 4 | e | 40° | ||
SGD 299.87 | 1 Piece(s) | 9 Day(s) | Meter | M28 | 1.5 | 130 | P3 | 45 | - | 21 | 17 | 20 | 4 | e | 40° | ||
SGD 300.58 | 1 Piece(s) | 8 Day(s) | Meter | M28 | 2 | 130 | P3 | 45 | - | 21 | 17 | 20 | 4 | e | 40° | ||
SGD 302.19 | 1 Piece(s) | 9 Day(s) | Meter | M30 | 2 | 135 | P3 | 45 | - | 23 | 17 | 20 | 4 | e | 40° | ||
SGD 302.19 | 1 Piece(s) | 9 Day(s) | Meter | M30 | 3 | 135 | P3 | 48 | - | 23 | 17 | 20 | 4 | e | 40° | ||
SGD 17.43 | 1 Piece(s) | 9 Day(s) | Meter | M8 | 1.25 | 70 | P3 | 22 | - | 6.2 | 5 | 8 | 3 | e | 40° | ||
SGD 36.44 | 1 Piece(s) | 9 Day(s) | unified | 7/16 | - | 80 | P3 | 25 | - | 8 | 6 | 9 | 3 | e | 40° | ||
SGD 39.16 | 1 Piece(s) | 9 Day(s) | unified | 1/2 | - | 85 | P3 | 29 | - | 9 | 7 | 10 | 3 | e | 40° | ||
SGD 58.72 | 1 Piece(s) | 9 Day(s) | unified | 5/8 | - | 95 | P3 | 32 | - | 12 | 9 | 12 | 3 | e | 40° | ||
SGD 103.80 | 1 Piece(s) | 9 Day(s) | unified | 3/4 | - | 105 | P3 | 37 | - | 14 | 11 | 14 | 4 | e | 40° | ||
SGD 103.80 | 1 Piece(s) | 9 Day(s) | unified | 3/4 | - | 105 | P3 | 37 | - | 14 | 11 | 14 | 4 | e | 40° | ||
SGD 147.28 | 1 Piece(s) | 9 Day(s) | unified | 7/8 | - | 115 | P3 | 38 | - | 17 | 13 | 16 | 4 | e | 40° | ||
SGD 147.28 | 1 Piece(s) | 9 Day(s) | unified | 7/8 | - | 115 | P3 | 38 | - | 17 | 13 | 16 | 4 | e | 40° | ||
SGD 219.74 | 1 Piece(s) | 9 Day(s) | unified | 1 8 | - | 125 | P3 | 45 | - | 20 | 15 | 18 | 4 | e | 40° | ||
SGD 60.45 | 1 Piece(s) | 9 Day(s) | Whitworth | 5/8 | - | 95 | P3 | 32 | - | 12 | 9 | 12 | 3 | e | 40° | ||
SGD 99.39 | 1 Piece(s) | 9 Day(s) | Whitworth | 3/4 | - | 105 | P3 | 37 | - | 14 | 11 | 14 | 4 | e | 40° | ||
SGD 140.68 | 1 Piece(s) | 9 Day(s) | Whitworth | 7/8 | - | 115 | P3 | 38 | - | 17 | 13 | 16 | 4 | e | 40° | ||
SGD 210.32 | 1 Piece(s) | 9 Day(s) | Whitworth | 1 | - | 125 | P3 | 45 | - | 20 | 15 | 18 | 4 | e | 40° | ||
SGD 22.48 | 1 Piece(s) | 9 Day(s) | Meter | M10 | 1.25 | 75 | P4 | 24 | - | 7 | 5.5 | 8 | 3 | e | 40° | ||
SGD 32.04 | 1 Piece(s) | 9 Day(s) | Meter | M12 | 1.75 | 82 | P4 | 29 | - | 8.5 | 6.5 | 9 | 3 | e | 40° | ||
SGD 43.90 | 1 Piece(s) | 9 Day(s) | Meter | M14 | 1.5 | 88 | P4 | 30 | - | 10.5 | 8 | 11 | 3 | e | 40° | ||
SGD 58.76 | 1 Piece(s) | 9 Day(s) | Meter | M16 | 1.5 | 95 | P4 | 32 | - | 12.5 | 10 | 13 | 3 | e | 40° | ||
SGD 58.76 | 1 Piece(s) | 9 Day(s) | Meter | M16 | 2 | 95 | P4 | 32 | - | 12.5 | 10 | 13 | 3 | e | 40° | ||
SGD 104.26 | 1 Piece(s) | 9 Day(s) | Meter | M20 | 2.5 | 105 | P4 | 37 | - | 15 | 12 | 15 | 4 | e | 40° | ||
SGD 382.18 | 1 Piece(s) | 9 Day(s) | Meter | M36 | 4 | 155 | P4 | 57 | - | 28 | 21 | 24 | 4 | e | 40° | ||
SGD 15.73 | 1 Piece(s) | 9 Day(s) | Meter | M2.5 | 0.45 | 44 | P4 | 9.5 | 16 | 3 | 2.5 | 5 | 2 | c | 40° | ||
SGD 17.43 | 1 Piece(s) | 9 Day(s) | Meter | M8 | 1.25 | 70 | P4 | 22 | - | 6.2 | 5 | 8 | 3 | e | 40° | ||
SGD 644.40 | 1 Piece(s) | 8 Day(s) | Meter | M32 | 1 | 145 | P2 | 21 | - | 24 | 19 | 22 | 4 | - | 40° | ||
SGD 644.40 | 1 Piece(s) | 8 Day(s) | Meter | M33 | 1 | 145 | P2 | 21 | - | 25 | 19 | 22 | 4 | - | 40° | ||
SGD 717.69 | 1 Piece(s) | 8 Day(s) | Meter | M34 | 1 | 155 | P2 | 26 | - | 28 | 21 | 24 | 4 | 8 | - | ||
SGD 717.69 | 1 Piece(s) | 8 Day(s) | Meter | M35 | 1 | 155 | P2 | 26 | - | 28 | 21 | 24 | 4 | 8 | - | ||
SGD 717.69 | 1 Piece(s) | 8 Day(s) | Meter | M36 | 1 | 155 | P2 | 26 | - | 28 | 21 | 24 | 4 | - | 40° | ||
SGD 522.70 | 1 Piece(s) | 9 Day(s) | Meter | M32 | 1.5 | 145 | P3 | 46 | - | 24 | 19 | 22 | 4 | 7 | - | ||
SGD 522.70 | 1 Piece(s) | 8 Day(s) | Meter | M32 | 2 | 145 | P3 | 46 | - | 24 | 19 | 22 | 4 | 7 | - | ||
SGD 522.70 | 1 Piece(s) | 8 Day(s) | Meter | M32 | 3 | 145 | P3 | 46 | - | 24 | 19 | 22 | 4 | 7 | - | ||
SGD 522.70 | 1 Piece(s) | 8 Day(s) | Meter | M33 | 1.5 | 145 | P3 | 46 | - | 25 | 19 | 22 | 4 | 7 | - | ||
SGD 522.70 | 1 Piece(s) | 8 Day(s) | Meter | M33 | 2 | 145 | P3 | 46 | - | 25 | 19 | 22 | 4 | 7 | - | ||
SGD 522.70 | 1 Piece(s) | 8 Day(s) | Meter | M33 | 3 | 145 | P3 | 46 | - | 25 | 19 | 22 | 4 | 7 | - | ||
SGD 605.68 | 1 Piece(s) | 8 Day(s) | Meter | M34 | 1.5 | 155 | P3 | 26 | - | 28 | 21 | 24 | 4 | 8 | - | ||
SGD 605.68 | 1 Piece(s) | 8 Day(s) | Meter | M34 | 2 | 155 | P3 | 52 | - | 28 | 21 | 24 | 4 | 7 | - | ||
SGD 605.68 | 1 Piece(s) | 8 Day(s) | Meter | M34 | 3 | 155 | P3 | 52 | - | 28 | 21 | 24 | 4 | 7 | - | ||
SGD 605.68 | 1 Piece(s) | 9 Day(s) | Meter | M35 | 1.5 | 155 | P3 | 26 | - | 28 | 21 | 24 | 4 | 8 | - | ||
SGD 605.68 | 1 Piece(s) | 8 Day(s) | Meter | M35 | 2 | 155 | P3 | 52 | - | 28 | 21 | 24 | 4 | 7 | - | ||
SGD 605.68 | 1 Piece(s) | 8 Day(s) | Meter | M35 | 3 | 155 | P3 | 52 | - | 28 | 21 | 24 | 4 | 7 | - | ||
SGD 605.68 | 1 Piece(s) | 8 Day(s) | Meter | M36 | 1.5 | 155 | P3 | 26 | - | 28 | 21 | 24 | 4 | 8 | - | ||
SGD 605.68 | 1 Piece(s) | 8 Day(s) | Meter | M36 | 2 | 155 | P3 | 52 | - | 28 | 21 | 24 | 4 | 7 | - |
Loading...
How can we improve?
How can we improve?